... The objective of the Western Hillsboro ASR Pilot Project is to test the feasibility of utilizing ASR technology for storage at this site and other sites identified in the CERP. Information gained from the pilot project will be used to develop an operating plan for the system, to refine the long-term operational goals of these and other ASR wells at the site, and to provide insight for future ASR projects, which may be constructed for similar purposes.
From page 47...
... Appendix F.: Excerpts from Draft Project Management Plan Western Hillsboro 47 The full-scale Western Hillsboro Impoundment and ASR system, as outlined in the CERP, will store excess water from the Hillsboro Basin when available (typically in the wet season) and release water into the Hillsboro Canal to maintain canal stages during dry periods.
From page 48...
... A 50-acre pilot impoundment that will be constructed and tested in conjunction with the horizontal wells. A pre-injection water treatment facility, if deemed necessary based on water quality testing A pre-discharge water treatment facility (for water recovered from the ASR wells, prior to discharge into a canal or reservoir)
From page 49...
... Appendix F.: Excerpts from Draft Project Management Plan Western Hillsboro Figure F-2 49
From page 50...
... 50 Figure F-3 Aquifer Storage and Recovery in the Comprehensive Everglades Restoration Plan
From page 51...
... Appendix F: Excerpts from Draft Project Management Plan Western Hillsboro ~ ~ ~ . -.- ~ ~ ~ ~ ~ ~ ~ ~ ma: 1 1 1 11 I~ 1~ 51 1 ~1 ~ .11 ~ .__ _ 1~ ~ ~ ~ lest 151 1 i__ .- ~ ~ i ~ ~ ~ ~ _ _.
From page 52...
... 52 Aquifer Storage and Recovery in the Comprehensive Everglades Restoration Plan _ = ,(~1 ~ .. ~ ' ~ 1 ~ 1 ' 1 , - , C'r~r Intel,- (1-~.
From page 53...
... The Western Hillsboro ASR Pilot Project is directly related to the full-scale component because it will be used to assess the feasibility of using ASR technology at this site, and other sites in the lower east coast region. Although not a CERP project, the SFWMD is currently co-funding the construction of an ASR well approximately five miles east of the pilot project location along the Hillsboro Canal.
From page 54...
... Task 7 - Test and Operate Pilot Impoundment and Horizontal Wells This task includes the operation and testing of the pilot impoundment in conjunction with the periodic testing of the horizontal wells. The purpose of this task is to test the effectiveness of the groundwater collection system with regards to water quantity and water quality.