From page 61...
... FACILITY INVESTIGATION TABLE OF CONTENTS FINAL CLOSURE SURVEY REPORT ABSTRACT DISCLAIMER EXECUTIVE SUMMARY I. INTRODUCTION Contents 13 14 ES-1 .1 OVERVIEW 1-1 1.2 BACKGROUND 1-1 1.2.1 History of the Facility 1-1 1.2.2 History of the Project 1-1 1.2.3 History and Phases of the Stabilization Program 1-2 1.3 OBJECTIVES OF STABILITIZATION 1-3 1.3.1 Objectives of the Stabilization Program 1-3 1.3.2 Objectives and Scope of the Investigation Phase 1-3 1.3.3 Objectives and Scope of the Design Phase 1-3 1.3.4 Objectives and Scope of the Implementation Phase 1.3.5 Assumptions in the Investigation Phase 61 1-4 1-4
From page 63...
... CONCEPTUAL DESIGN PROPOSAL 4-1 4-1 4-2 4-2 4-2 4-3 4-4 4-4 4-7 4-8 4-10 4-11 4-12 5.1 OVERVIEW 5-1 CONCEPTUAL DESIGN: GROUNDWATER CAPTURE SYSTEM 5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 63 Strategy and Basis for the Conceptual Design Conceptual Design Criteria and Performance Standards Conceptual Design for the Groundwater Capture System Modeling and Testing the Conceptual Design Preliminary Plans for Performance Monitoring and Confirmatory Sampling 5-1 5-2 5-2 5-3 5-4 5-6
From page 64...
... PROJECT MANAGEMENT 6.1 6.2 6.3 OVERVIEW PROJECT ORGANIZATION SCHEDULE 6.3.1 Design Phase 6.3.2 Implementation Phase 6.3.3 Stabilization Program Report Preparation CONTINGENCIES AND CONSIDERATIONS 6.4.1 Contingencies and Planned Responses 6.4.2 Critical Success Factors 6.5 SUMMARY LIMITATIONS REFERENCES APPENDICES APPENDIX A GLOSSARY APPENDIX B BORING LOGS APPENDIX C WELL INSTALLATION/CONSTRUCTION LOGS APPENDIX D GEOTECHNICAL DATA APPENDIX E WELL SAMPLING LOGS APPENDIX F WATER LEVEL MEASUREMENTS APPENDIX G PRECIPITATION DATA APPENDIX H STEP-DRAWDOWN TEST DATA AND ANALYSES APPENDIX I 72-HOUR CONSTANT RATE TEST DATA AND ANALYSES APPENDIX J 30-DAY CONSTANT RATE TEST DATA AND ANALYSES APPENDIX K ADDITIONAL CONSTANT RATE TEST DATA AND ANALYSES APPENDIX L—CAPTURE ZONE MODELING APPENDIX M INDUSTRIAL WASTEWATER PERMIT NO.
From page 65...
... 1 Excavation 2-5 2.3.1.2 Post-Excavation Sampling 2-5 2.3.1.3 Post-Excavation Sample Results 2-6 2.3.1.4 Evaluation 2-6 2.3.2 PhaseII 2-6 2.3.2.1 Excavation 2-6 2.3.2.2 Post-Excavation Sampling 2-7 2.3.2.3 Post-Excavation Sample Results 2-7 2.3.2.4 Evaluation 2-7 2.3.2 PhaseII 2-6 2.3.2. 1 Excavation 2-6 2.3.2.2 Post-Excavation Sampling 2-7 2.3.2.3 Post-Excavation Sample Results 2-7 2.3.2.4 Evaluation 2-7 2.3.3 Phase III 2-8 2.3.3.1 Excavation 2-8 2.3.3.2 Post-Excavation Sampling 2-8 2.3.3.3 Post-Excavation Sample Results 2-8 2.3.3.4 Evaluation 2-9 2.3.4 PhaseIV 2-9 2.3.4.1 Delineation Sampling 2-9 2.3.4.2 Delineation Sampling Results 2-9 2.3.4.3 Excavation 2-9 2.3.4.4 Evaluation 2.3.5 Transport and Disposal 2.4 PRODUCTION AREA "A" CONCLUSIONS 3.0 AREA "B" EXCAVATION ACTIVITIES 2-10 2-10 2-10 3-1 3.1 PRELIMINARY TASKS 3-1 3.1.1 Proposed Media Protection Standards (MPS)
From page 66...
... 1.4 Evaluation Phase II 3.3.2.1 Delineation Sampling 3.3.2.2 Delineation Sampling Results 3.3.2.3 Evaluation 3.3.2.4 Excavation Transportation and Disposal 3.4 AREA "B" CONCLUSIONS 3-2 3-3 3-4 3-4 3-4 3-5 3-6 3-6 3-6 3-6 3-6 3-7 3-7 3-7 3-7 3-8 3-8 3-8