Skip to main content

Currently Skimming:

Appendix B: Quality Assurance and Quality Control
Pages 26-38

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 26...
... The third heading describes inconsistencies between document and code whose effect cannot be determined by the committee. Finally, the fourth heading lists many transcription errors discovered by the committee; most of them probably resulted in trivial effects on the calculations, but a few could have a large effect (for example, if such an error coincides with a critical calibration measurement)
From page 27...
... .rel" files in the \rrates subdirectories for individual nuclides. For example, examination of the "lOOKWmed.rel" files indicates that the reactor supposedly represented by files of these names started operation at day 335 in 1944.
From page 28...
... The value assigned to eps (10-6) was supposed to approximate the maximum possible relative error in the Simpson rule integration, but the error in the code means that the maximum relative error is of order the square root of eps (10-3)
From page 29...
... At the beginning of a month, the release rate is taken to be the average value for that month; then, throughout the month, the release rate is linearly changed until at the end of the month it is equal to the average release rate in the following month. The same linear interpolation has been performed for river flow rates (in subroutine "getflow")
From page 30...
... The data entered in the workbook "reactor operations.xls" contain numerous errors. The committee noted the following errors in the sheet "Reactor Data", but the technique used by the committee to discover these errors does not guarantee the ansence of other errors.
From page 31...
... I/53 Should be 37.S, not 37.9 3/55 Should be 48.S, not 49.S 6/56 Should be 45.S, not 45.9 12/58 Should be 76.8, not 76.9 9/59 Should be 82.8, not 82.9 8/61 Should be 88.4, not 98.4 9/61 Should be 88.6, not 98.6 10/62 Should be 88.9, not 89.9 1/63 Should be 89.3, not 99.3 4/63 Should be 89.3, not 99.3 5/63 Should be 89.S, not 99.S 1/65 Should be 87.5, not 97.5 5/65 Should be 90.0, not 0.9 11/65 Should be 88.7, not 89.7 9/67 Should be 95.8, not 95.9 C Reactor power (MOO) 6/46 Should be 0, not 1 1/47 Should be 0, not 1 5/53 Should be 876, not 976 11/59 Should be 1812, not 1912 10/60 Should be 1835, not 1935 31
From page 32...
... ~ I/55 Should be 87S, not 78 12/55 Should be 843, not 43 3/56 Should be 886, not 896 5/56 Should be 83 I, not 93 ~ 8/56 Should be 847, not 947 10/59 Should be 154S, not 1549 2/61 Should be 1864, not 1964 3/61 Should be IS7l, not 1971 6/65 Should be 1889, not 1989 8/66 Should be IS04, not 1904 D Reactor energy production (MWd) 12/47 Should be 5810, not 5910 32
From page 33...
... 2/52 Should be 380, not 390 5/52 Should be 548, not 549 12/55 Should be 862, not 962 2/56 Should be 828, not 929 4/61 Should be 162S, not 1629 5/61 Should be 1803, not 1903 2/62 Should be 1825, not 1925 4/62 Should be 1648, not 1649 4/63 Should be 1 ~ 10, not 1510 DR Reactor energy production (MWd) 5/52 Should be 16480, not 16490 S/54 Should be 20480, not 20490 11/61 Should be 43780, not 43790 6/62 Should be 18600, not 19600 DR Reactor water flow rate (Kgpm)
From page 34...
... 12/53 Should be 42.S, not 42.9 6/54 Should be 42.S, not 42.9 10/54 Should be 42.7, not 42.0 6/55 Should be 49.S, not 49.9 S/55 Should be 50.S, not 50.9 6/57 Should be 70.5,not703 2/60 Should be 80, not 50 7/60 Should be 83.9, not 93.9 12/60 Should be 84.2, not 94.2 5/61 Should be 87.S, not 87.9 9/61 Should be 88.7, not 98.7 Il/61 Should be 87.S, not 97.S 12/61 Should be 87.7, not 97.7 F Reactor power ~ 6/45 Should be 25S, not 259 I/47 Should be 19S, not 199 12/48 Should be 26S, not 269 7/51 Should be 386, not 396 9/52 Should be 48S, not 499 2/54 Should be 62S, not 629 5/57 Should be 1058, not 1059 10/61 Should be 173S, not 1739 9/64 Should be 1681, not 1691 4/65 Should be IS77, not 1977 F Reactor energy production Crowd) 2/47 Should be 5250, not 525 12/49 Should be 7680, not 7690 5/50 Should be 8670,not9670 6/50 Should be 8480,not8490 3/51 Should be Il650,notIl630 6/52 Should be 10880, not 10550 3/53 Should be 14780,notI4790 S/53 Should be 16080, not 16090 ~ 0/53 Should be ~ 8700, not ~ 9700 I/54 Should be 16870, not 16970 8/54 Should be 20830, not 20930 2/57 Should be 23480, not 23490 3/59 Should be 28690, not 29690 12/59 Should be 40280, not 40290 4/61 Should be 48880, not 48890 8/61 Should be 38830, not 38930 I/64 Should be 44580, not 44590 34
From page 35...
... 9/51 Should be 53S, not 539 2/52 Should be 558, not 559 2/54 Should be 889, not 999 3/54 Should be 877, not 977 2/60 Should be 170S, not 1709 4/62 Should be 169S, not 1699 3/63 Should be IS6l, not 1961 8/64 Should be ~ 832, not ~ 932 H Reactor energy production (MWd) 10/50 Should be ~ 1430, not 0.]
From page 36...
... 9/55 Should be 1068, not 1069 9/56 Should be l~ll,not 1511 2/58 Should be 2877, not 2977 1/61 Should be 3802, not 3902 3/61 Should be 3818, not 3918 9/61 Should be 3508, not 3509 12/61 Should be 3870, not 3970 5/62 Should be 3988, not 3998 12/63 Should be 414S, not 4149 9/66 Should be 418S, not 4198 2/67 Should be 4380, not 4390 7/69 Should be 3758, not 3759 KE Reactor energy production (MWd) 3/56 Should be 53850, not 53950 3/57 Should be 58660, not 59660 6/58 Should be 78910, not 79910 2/60 Should be 73930, not 73936 36
From page 37...
... not 15 KW Reactor power (KW) On "Power_data" sheet the column labeled "KW Power" erroneously contains the KW reactor energy production in place of power.
From page 38...
... The transcription accuracy appeared to be much better than that of the transcription of Tables A.1 and A.2 to "reactor operations.xls", but there were obvious errors, such as those: 3/55 Med Cr-51 3/46 Min Np-239 Should be 24100, not 2410 Should be 14700, not 147000 In the reactor data sheet of the "reactor operations.xls" workbook Month I/49 should be 8/49 Month 9/51 should be 8/5 ~ Month 9/61 should be 8/61 Month 9/66 should be 8/66 38 i,


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.