From page 1...
... into electricity, process heat, fuels, and/or chemicals cost effectively, with very high efficiency and very low emissions, including of the greenhouse gas carbon dioxide (CO2)
From page 2...
... As noted in the Vision 21 Technology Roadmap, if the program meets its goals, Vision 21 plants would essentially eliminate many of the environmental concerns traditionally associated with the conversion of fossil fuels into electricity and transportation fuels or chemicals (NETL, 2001~. Given the importance of fossil fuels, and especially coal, to the economies of the United States and other countries and the need to utilize fossil fuels in an efficient and environmentally acceptable manner, the development of the technologies in the Vision 21 Program is a high priority.
From page 3...
... The Vision 21 Program Plan anticipates a variety of possible energy plant configurations processing a variety of fossil and waste fuels and producing a varied slate of products to meet specific market needs. In most cases, the primary or only product will be electricity, but other products such as transportation fuels, chemicals, synthesis gas (syngas)
From page 4...
... A more rigorous management structure is needed to accomplish the ambitious goals of the Vision 21 Program. The Vision 21 program manager should be provided with the budget and overall responsibility and authority needed to manage the program, including appropriate staff responsible for program planning, implementation, and evaluation.
From page 5...
... Systems integration and engineering analysis should play a far more prominent role in the Vision 21 Program and management structure than is currently the case. The key planning decisions, such as decisions about priorities and funding levels for the various component technologies, should stem from careful and systematic analyses of alternative options and their likelihood of success.
From page 6...
... , fuel cell, or gas turbine-fuel cell hybrid power plants at high energy conversion efficiencies. These are the combinations of coal-conversion technology and energy-conversion technology most likely to have the potential to achieve the 60 percent (based on higher heating value, HHV)
From page 7...
... The U.S. Department of Energy development programs for Vision 21 technologies for gas cleanup, fuel cells, and power production with advanced gas turbines do not currently include adequate testing of these technologies on actual coal-derived synthesis gas (syngas)
From page 8...
... Gas Purification Finding. The objectives of the gas purification program are not stated quantitatively or with the required cost targets, and the milestones are insufficiently detailed to permit intermediate assessments of progress towards goals.
From page 9...
... accomplishment of significant steps in preparation for plant construction and operation, including developments, tests, designs, and evaluations of performance and costs for both the demonstration plant and the projected commercial plant. To the extent possible, the milestones should include quantitative measures as criteria for successful achievement, such as overall capital and operating costs of the projected commercial plant.