Skip to main content

Currently Skimming:

Appendix B: FCF Demonstration Program, Revised Scope, January 1996
Pages 17-17

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 17...
... B FCF DEMONSTRATION PROGRAM, REVISED SCOPE, JANUARY 1996 FY 1996 Complete NEPA review DOE authorization to operate Process first batch of 4 driver assemblies Initiate cold large-scale mineral waste form tests Produce first low-enriched uranium storage ingot Complete electrometallurgical treatment of 16 driver assemblies FY1997 Complete electrometallurgical treatment of 48 driver assemblies Install high-throughput electrorefiner in FCF Initiate hot mineral waste form sample production FY 1998 Complete electrometallurgicai treatment of 36 driver assemblies Complete electrometallurgical treatment of 25 blanket assemblies 17 02/96 02/96 03/96 03/96 06/96 09/96 09/97 09/97 09/97 03/98 09/98

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.