Appendix B: ANCDF Campaign Schedule Options
Pages 49-50

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 49...
... The modified plan also has fewer changeover periods since all the GB is processed before munitions or containers of VX nerve agent or mustard agent are processed. The first schedule under the modified plan provides for a processing rate of 9.2 gelled GB rockets per hour, whereas the second schedule indicates the number of days necessary for each campaign if processing of the gelled GB rockets at Anniston is restricted to the permitted rate of 1.6 rockets per hour that was used at TOCDF.
From page 50...
... 458 458 HD/HT 4.2-in. 467 467 Changeover 19 19 Changeover 19 19 HD ton container 30 30 HD ton container 30 30 Changeover 42 42 Changeover 42 42 HD 105-mm 53 53 HD 105-mm 43 43 Changeover 42 42 Changeover 42 42 HD 155-mm 99 99 HD 155-mm 74 74 Operations end 27 Aug 09 2 Dec 09 Operations end 18 Jan 09 23 Apr 10 Total duration 6.9 years 7.2 years Total duration 6.3 years 7.6 years Source: Adapted from SAIC, 2002, Risk Management Analysis: Effect of Gelled Rocket Processing Schedule Changes on Storage Risk and ANCA, August 9, Abingdon, Md.: SAIC.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.