... . A brief summary of the Interim Report is provided below.
From page 7...
... Multiple performance models relating system response to simulants and live agents should be considered to address the different metrics, including sensitivity and false alarm rates, in component and whole system testing. To address component-whole system correlation at an appropriate level of detail, there should be an integrated experimental plan, coordination of data analysis reports across component and system T&E, system modeling, and creation of an integrated evaluation team.
From page 8...
... Thus, the purpose of this final report is to expand upon the recommendations provided in the interim report and to evaluate the specific WSLAT proposal under consideration. 1"Full-rate production" is defined as contracting for economic production quantities following stabilization of the system design and validation of the production process.
From page 9...
... Technical and schedule risk for WSLAT can be reduced by addressing the areas of concern the committee identifies in Chapter 3 and holding an external design review for the updated plan. Chapter 4 provides an outline of recommended evaluation strategies that the committee believes are both technically defensible and that will more adequately support the Army's needs for biological agent2 detection system testing and evaluation than would the current WSLAT proposal alone.