Appendix D Time and Cost Estimate for the Development of a New Conventional Handgun
Pages 69-70

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 69...
... . Will depict desired fits and clearances prior to modeling, resulting in a somewhat longer design period but a much shorter time for modeling, testing, etc.
From page 70...
... 70 APPENDIX D Concept 3 months 1st Generation 3­6 months 2nd Generation 6 months Worst Case Iterations 6 months Tooling/Gauging 12 months Pilot Lot 12 months 27 to 36 months Timeline for development.