Skip to main content

Currently Skimming:

B Research Projects Under the Strategic Highway Research Program 2 as of July 3, 2008
Pages 146-148

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 146...
... Development of Analysis Methods Using Recent Data Active SHRP 2 S01 (E) Development of Analysis Methods Using Recent Data Active SHRP 2 S02 Integrate Methods and Develop Analysis Plan Active SHRP 2 S03 Roadway Measurement System Evaluation Active SHRP 2 S04 Acquisition of Roadway Information Anticipated SHRP 2 S05 Design of the In-Vehicle Driving Behavior and Crash Risk Study Active SHRP 2 S06 Technical Coordination and Independent Quality Assurance for Anticipated Field Study SHRP 2 S07 In-Vehicle Driving Behavior Field Study Anticipated SHRP 2 S08 Analysis of In-Vehicle Field Study Data and Countermeasure Anticipated Implications SHRP 2 S09 Site-Based Video System Design and Development Active SHRP 2 S10 Design and Conduct of the Site-Based Field Study Anticipated SHRP 2 S11 Analysis of Site-Based Field Study Data and Anticipated Countermeasure Implications SHRP 2 Renewal Projects SHRP 2 R01 Encouraging Innovation in Locating and Characterizing Active Underground Utilities SHRP 2 R02 Geotechnical Solutions for Soil Improvement, Rapid Embankment Active Construction, and Stabilization of the Pavement Working Platform SHRP 2 R04 Innovative Bridge Designs for Rapid Renewal Active SHRP 2 R05 Modular Pavement Technology Active SHRP 2 R06 A Plan for Developing High Speed, Nondestructive Testing Active Procedures for Both Design Evaluation and Construction Inspection (continued)
From page 147...
... Bridges for Service Life Beyond 100 Years: Service Limit RFP State Design SHRP 2 R21 Composite Pavement Systems Active SHRP 2 R23 Using Existing Pavement in Place and Achieving Long Life Active SHRP 2 R26 Preservation Approaches for High Traffic Volume Roadways Active SHRP 2 Reliability Projects SHRP 2 L01 Identification and Analysis of Best Practices Activea SHRP 2 L02 Establishing Monitoring Programs for Mobility and Anticipated Travel Time Reliability SHRP 2 L03 Analytic Procedures for Determining the Impacts of Reliability Active Mitigation Strategies SHRP 2 L04 Incorporating Reliability Performance Measures in Planning Anticipated and Operations Modeling Tools SHRP 2 L05 Incorporating Reliability Performance Measures into the Anticipated Transportation Planning and Programming Processes SHRP 2 L06 Institutional Architectures to Advance Operational Strategies Active SHRP 2 L07 Evaluation of Cost-Effectiveness of Highway Design Features Active SHRP 2 L08 Incorporation of Non-Recurrent Congestion Factors into the Anticipated Highway Capacity Manual Methods SHRP 2 L09 Incorporation of Non-Recurrent Congestion Factors into the Anticipated AASHTO Policy on Geometric Design SHRP 2 L10 Feasibility of Using In-Vehicle Video Data to Explore RFP How to Modify Driver Behavior That Causes Non-Recurring Congestion SHRP 2 L11 Evaluating Alternative Operations Strategies to Improve Travel RFP Time Reliability SHRP 2 L12 Training and Certification for Traffic Incident Responders Pending SHRP 2 L13 Requirements and Feasibility of a System for Archiving and RFP Disseminating Data from SHRP 2 Reliability and Related Studies SHRP 2 L14 Effectiveness of Different Approaches to Disseminating Anticipated Traveler Information on Travel Time Reliability SHRP 2 L15 Reliability Innovations Deserving Exploratory Analysis (IDEA) Anticipated (continued on next page)
From page 148...
... SHRP 2 C08 Linking Community Visions and Highway Capacity Planning Anticipated SHRP 2 C09 Incorporating Greenhouse Gas Emissions into the Anticipated Collaborative Decision-Making Process SHRP 2 C10 Partnership to Develop an Integrated, Advanced Travel Anticipated Demand Model and a Fine-Grained, Time-Sensitive Network SHRP 2 C11 Development of Improved Economic Analysis Tools Based on Anticipated Recommendations from Project C03 (2) SHRP 2 C12 The Effect of Public-Private Partnerships and Non-Traditional Anticipated Procurement Processes on Highway Planning, Environmental Review, and Collaborative Decision Making SHRP 2 C13 Integrating Full Cost Analysis and Fiscal Impact Analysis into Anticipated Collaborative Decision Making SHRP 2 C14 Developing a Multiagency Change Management Framework Anticipated SHRP 2 C15 Integrating Freight Considerations into Collaborative Decision Anticipated Making for Additions to Highway Capacity SHRP 2 C16 The Effect of Smart Growth Policies on Travel Demand Anticipated aThis request for proposals (RFP)


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.