... This synthesis addresses the craft. Most of the common problems that occur during erection can be prevented by taking the following measures: • Verifying horizontal and vertical alignment before and during erection; • Installing enough crossframes to maintain geometry and girder stability during erection; • Properly using temporary falsework or additional cranes; and • Rigorously following pinning, bolting, and tightening procedures.