Skip to main content

Steel Bridge Erection Practices (2005) / Chapter Skim
Currently Skimming:

Appendix A - Survey Questionnaire
Pages 20-29

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 20...
... Please send the requested specifications and other documentation before August 9, 2002, to: Fred Beckmann Consultant 167 Hawthorne Lane Chicago Heights, IL 60411 If you have any questions, please contact Mr. Beckmann by telephone at 708-754-1677 or by e-mail at frbeckmann@att.net.
From page 21...
... Name , Phone , E-mail address , and any other available information 4. Have you experienced any stability issues as a result of wind loads, deck overhang, concrete placement, lifting and handling, and temporary and/or permanent bracing or supports?
From page 22...
... Name , Phone , E-mail address , and any other available information 9. If you are concerned with actual deflections and girder rotations due to geometry, what methods of analysis do you use to predict these deflections for straight or curved I-girders or box girders on normal or skewed supports?
From page 23...
... Name , Phone , E-mail address , and any other available information 17. Were the problems noted in Question 16 due to improper erection procedures?
From page 24...
... 29. In summary, what are the key issues associated with achieving a properly erected structure?
From page 25...
... Please send any additional documentation or materials before August 9, 2002, to: Fred Beckmann Consultant 167 Hawthorne Lane Chicago Heights, IL 60411 If you have any questions, please contact Mr. Beckmann by telephone at (708)
From page 26...
... The primary focus of the synthesis report is based on a rather extensive set of questions that has been sent to the state bridge engineers; however, several of the issues require fabricator and erector input.
From page 27...
... Please send any additional documentation or materials before August 9, 2002, to: Fred Beckmann Consultant 167 Hawthorne Lane Chicago Heights, IL 60411 If you have any questions, please contact Mr. Beckmann by telephone at (708)
From page 28...
... The primary focus of the synthesis report is based on a rather extensive set of questions that has been sent to the state bridge engineers; however, several of the issues require fabricator and erector input.
From page 29...
...  Yes  No If Yes, please supply any information about the severity and frequency of the problems, their causes, appropriate fixes, and any recommendations that would prevent the problems on future work. Please furnish a contact name and phone number so to that we may discuss the issues in more detail.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.