Skip to main content

Steel Bridge Erection Practices (2005) / Chapter Skim
Currently Skimming:


Pages 8-9

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 8...
... Curved Box-Girder Assembly All respondents that fabricate boxes do bearing-to-bearing and/or a minimum of three-girder assembly. Five assemble curved box girders with crossframes.
From page 9...
... The erector should provide an erection procedure that addresses measures that lead to the desired erected structure, keep the ends of the girders aligned and webs vertical, properly orient match-marked splice plates, and use qualified erectors and experienced crews. In general, horizontal and vertical alignment verification of both the substructure and the superstructure at all stages of the process is critical to attaining a well-positioned and erected structure.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.