Chapter Seven - Costs
Pages 55-59

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 55...
... Costs included were consultant costs for projects using consultants and the value of in-house staff time for projects conducted using in-house agency staff. (A few agencies reported the value of in-house staff time; in other cases, the value was estimated using approximated wage rates for professional, clerical, and field staff.)
From page 56...
... Est. Total Costs Completed Surveys Cost per Survey Completed Response Rate If O&D Survey Unlinked Trips per Vehicle Hour Self-Administered Surveys Distributed by Survey Staff GCRTA (Cleveland)
From page 57...
... Project Gobility $235,000 $235,000 4,211 $55.81 33% Yes 25 $3,440 Agency Project Name Consultant Cost Est. InHouse Staff Costs*
From page 58...
... Shown only for surveys conducted on board throughout the transit system. Agency Project Name Consultant Cost Est.
From page 59...
... • Incentives • Frequency of surveying External factors • Density of riders on route or in stations • Rider income, education, literacy • Trip length FIGURE 6 Summary of factors affecting data quality and cost.