Skip to main content

Currently Skimming:


Pages 5-6

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 5...
... The objectives of this synthesis project were to • Survey and identify gaps in the literature; • Determine practices and problems with how bridge owners define, identify, document, inspect, and manage bridges with fracture-critical details; and • Identify research needs. The scope of the project included studying • Inspection frequencies and procedures; • Methods for calculating remaining fatigue life; • Qualification and training of inspectors; • Available and needed training; • Experience with FCM fractures and problem details; • Examples of where inspection programs prevented failures; • Cost of inspection programs; • Retrofit techniques, including emerging technologies; • Nondestructive evaluation (NDE)
From page 6...
... Additional detail on these subjects is also presented in Appendix A, along with details on fatigue life prediction, NDE, repair and retrofit techniques, and the impact of high-performance steel (HPS)


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.