Section IV - Index of Strategies by Implementation Timeframe and Relative Cost
Pages 13-14

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 13...
... EXHIBIT IV-1 Classification of Strategies According to Expected Timeframe and Relative Cost Relative Cost to Implement and Operate Timeframe for Moderate Implementation Strategy Low Moderate to High High Short (<1 year) 19.1 B2 -- Improve visibility of work zone traffic ✔ control devices 19.1 B3 -- Improve visibility of work zone ✔ personnel and vehicles 19.1 B4 -- Reduce flaggers' exposure to traffic ✔ 19.1 C2 -- Implement measures to reduce work ✔ space intrusions (and limit consequences of intrusions)
From page 14...
... 19.1 A6 -- Design future work zone capacity into ✔ new or reconstructed highways * Costs of improvements on parallel routes may be significant.