Skip to main content

Bridge Inspection Practices (2007) / Chapter Skim
Currently Skimming:

Chapter Six - Conclusions
Pages 48-50

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 48...
... U.S. federal regulations require team leaders for all inspections, with the result that administration of all inspection work remains within a DOT's inspection program using either DOT staff or inspection consultants.
From page 49...
... Personnel U.S. Denmark Finland France Germany Norway South Africa Sweden United Kingdom Non-Certified Inspector Routine Annual Annual Superficial General Monitoring Superficial Superficial Routine General 5-year IQOA Minor General Routine 48-month General Detailed 8-year Agency Certified Inspector In-depth 120-month Principal Basic Major Major Principal General PrincipalEngineer Economic Special Special IQOA = Image de la Qualité des Ouvrages d'Art.
From page 50...
... Inspection Program U.S. Denmark Finland France Germany Norway South Africa Sweden United Kingdom Daily Annual Routine Superficial Monitoring Superficial SuperficialPartial or No Control Routine Annual Routine Principal General IQOA 5-year Minor General General General Routine 48-month General 8-year Major Principal Major Principal Primary Control In-depth 120-month Economic Special Special Detailed Major Special Projectlevel Special Special IQOA = Image de la Qualité des Ouvrages d'Art.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.