Skip to main content

Currently Skimming:

Advanced Processes
Pages 25-27

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 25...
... ADVANCED PROCESSES An advanced process performed in the O&M functional area by the KYTC includes: • Internally: XML is utilized whenever possible for export and import of data between software applications. CHAPTER SEVEN INFORMATION TECHNOLOGY FOR OPERATIONS AND MAINTENANCE Data Type Receive Process/Generate Send Final Survey 10–45% 6–27% 4–18% As-Built Quantities 11–50% 7–32% 8–36% As-Built Drawings 9–41% 7–32% 7–32% Pay Requests 6–27% 7–32% 6–27% EEO Compliance 4–18% 4–18% 4–18% SWP3 Documentation 4–18% 4–18% 3–14% Certified Payroll 4–18% 3–14% 3–14% Contract/Bid Docs 10–45% 6–27% 5–23% Claims 10–45% 7–32% 6–27% Other Data: Contract Completion Acceptance 1–4% Local Agency Payment System 1–4% 2–8% 1–4% Traffic Flow Data 1–4% 1–4% 1–4% Construction Submittals 1–4% 1–4% 1–4% Underground Feature Inventory 1–4% Contract Awards 1–4% Maintenance Activity Reporting 1–4% 1–4% 1–4% Video Data 1–4% 1–4% 1–4% Pavement Condition Survey 1–4% Safety, Signal, Sign 1–4% 1–4% 1–4% Incident 1–4% 1–4% 1–4% Integrated Maintenance Management System 1–4% Bridge and Sign Structure 1–4% 1–4% 1–4% Construction Information 1–4% 1–4% 1–4% Bridge Level of Service 1–4% Road Weather Information 1–4% 1–4% 1–4% Maintenance Program Level Action Plan 1–4% TABLE 12 DATA RECEIVED, PROCESSED/GENERATED, SENT FROM DOT OPERATIONS AND MAINTENANCE FUNCTIONAL AREAS
From page 26...
... 27 FIGURE 12 KYTC data work-flow diagram for operations and maintenance functional area.
From page 27...
... KYTC reported the following barrier and challenge to advanced processes implementation: – Lack of appropriate numbers of staff with required technical training and skill sets to utilize multiple software applications, especially with a recent generation of personnel eligible and becoming eligible for retirement.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.