... Furthermore, an expanded pile cap or connecting beam often is required to structurally connect the new piles to the existing pile group. Although these structural approaches provide the required lateral resistance, they may also be relatively expensive and time consuming An alternative approach is to use soil improvement techniques to increase the strength and stiffness of the surrounding soil and thereby increase the lateral resistance of the pile group.
From page 4...
... Improved Soil 4-5D 3-4D (a) Existing Foundation (b)