Skip to main content

Currently Skimming:

Graphics Capabilities Required of Private Architects and Engineers (A/Es)
Pages 19-22

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 19...
... POSTAL SERVICE (USPS) Outside contracted A/Es are required by the Office of Design and Construction to have a CAD system capable of running Postal Service software if the purpose of the contract is the site adaptation of CAD based standard plans.
From page 20...
... The medical centers are starting to require that all CAD drawings utilize the national CAD Layer Guidelines as specified by the ACEC/AIA/ASCE/IFMA (American Consulting Engineers Council/American Institute of Architects/ American Society of Civil Engineers/International Facility Managers Association) Task Force on CAD Layer Guidelines.
From page 21...
... OTHER AGENCIES The Department of State and the Port Authority of New York and New Jersey report no graphics capability requirements from outside contractors. The Public Health Service reports that new A/E contracts are stipulating that drawings be provided in AutoCAD format.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.