Skip to main content

Currently Skimming:

MANAGEMENT CONSIDERATIONS
Pages 23-29

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 23...
... Because of the obvious impact of these decisions on the scientific integrity of the experiment, it is important that this body be headed by an individual of unquestioned scientific competence and stature. In Chapter 3 it was shown that the total observational system can be 23
From page 24...
... For example, one group might be charged with the task of designing the radiosonde network. Presumably, their duties would include specification of the spacing of ships, the time schedule, the accuracy requirements, instrumentation, dataprocessing procedures, and archiving.
From page 25...
... 6.4 Field Operations 6.4.1 There is need for a real-time capability in directing the aircraft operations. This means that the lead time for flight plans must be short compared to the time scale of the mesoscale convective systems they will be sampling.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.