Summary
Pages 1-7

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 1...
... , producing primary stockpile at PCD may need to be halted unless there a solidified filter cake that is intended to be sent offsite to a is sufficient storage capacity for hydrolysate while agent permitted hazardous waste disposal facility. Water recovered hydrolysis continues, or there is an alternative means for from the brine reduction system is intended to be recycled treatment of the hydrolysate.
From page 2...
... committee, the Committee on Review Criteria for Successful Treatment of Hydrolysate at the Pueblo and Blue Grass Recommendation 3-1. In consultation with the CAC, Chemical Agent Destruction Pilot Plants (referred to in this ACWA should institutionalize an explicit consultation proreport as "the committee")
From page 3...
... In its recent white paper on risk reduction and presence of TDG is a concern, the primary hazard during mitigation, PCAPP has done a thorough job of identifying transportation of hydrolysate comes from the caustic nature potential failure risks and providing targeted strategies to of the hydrolysate. mitigate these risks in the BTA (PCAPP, 2014)
From page 4...
... As explained a number of potential failure risks within the BTA at the in Chapter 7, downstream from the ICBs, the WRS and PCAPP facility. PCAPP itself identified several such sources BRS will enable PCAPP to recover and recycle most of the of possible failure in the BTA along with contingency options process water into munitions processing.
From page 5...
... described in Chapter 6 and assigned to a performance cat- OFFSITE SHIPMENT AS A CONTINGENCY OPTION egory based on the overall risk to PCAPP operations. The committee acknowledges that there are many uncer The committee believes that PCAPP has adequately tainties surrounding the start-up and performance of each researched potential issues with BTA operations and believes separate component within the BTA and that one or more that the risk reduction and mitigation measures to be con contingency options may have to be implemented.
From page 6...
... to accom- Implementing offsite transport of hydrolysate will affect modate performance issues, to interim actions while other plant, paper, and people, as discussed in Chapter 7, and the contingency options are being implemented (e.g., construct- effort to implement offsite transport will be considerable. If ing and employing additional hydrolysate storage capacity)
From page 7...
... Washington, D.C.: The National Academies Press. procedures; preparing transportation risk documentation; PCAPP (Pueblo Chemical Agent Destruction Pilot Plant)