Appendix H: Conceptual Model for Facilitating the WFO Approval Process
Pages 76-79

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 76...
... required in each WFO contract. A careful review of all current D&Fs would allow a comprehensive list of work that has already been attested by both 1  This appendix is based on material supplied by Dori Ellis, Associate Director at Large for Interagency Mission Enhancement, Lawrence Livermore National Laboratory, on September 17, 2014.
From page 77...
... 3. Etc. The Department of Energy concurs that work executed under this Work Scope Agreement is consistent with the missions of DOE and within the capabilities and capacity of Lawrence Livermore National Laboratory.
From page 78...
... This agreement would be between the DOE/NNSA and its laboratories. It covers those areas of operations requirements that must be met for the IOs to receive automatic approval (with an appropriate audit trail)
From page 79...
... Work outside of the norm -- for example, work that requires expanding the safety basis of a facility, introducing Category I or Category II radioactive material onto the site, having explosives over a certain limit, requiring facility modification over a some limit, or other "off-normal" conditions, could be exempted from the pre-approval process and require additional review by the field office.