Skip to main content

Currently Skimming:


Pages 174-176

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 174...
...   177    APPENDIX 5 CASE STUDY CANDIDATES       1. Short Line Case Study – Appalachian Regional Short Line Rail Project (WV, KY, TN)     Criteria: Multi‐state, Short Line, TIGER I, Public Private   Lead: State of Kentucky, Kentucky Transportation Cabinet   Total Project: $22 million  2. Commuter Rail Case Study ‐ Colorado RTD Eagle P3    Criteria: Transit, Public Private   Lead: Denver Regional Transportation District (RTD)
From page 175...
... Criteria Matrix for Case Study Selection Process 178 
From page 176...
...    Commu Up until no constructio the two ar Light Rail RTD's light than most has the abi acceleratio Commute Who manu 15,000 ele Why do yo Line, the f to use. The Why not u commuter vehicles tr the mode o Powered by 25k Typically serves Can operate up Capacity of 91 s Used on East R Line ter Rail v w, RTD's train n are being bu e significant.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.