Skip to main content

Currently Skimming:


Pages 3-9

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 3...
...  Backgr A 20‐ques distribute planning a firms, and field of ex the respo the survey "others" i authoritie The follow Stakeh Does you More tha 32 percen that othe RAI ound tion survey w d to more th nd economi  universities. pertise. We r ndents repre .
From page 4...
...     Does you   Without a award a g than 5 pe offered at available  How muc Three stat awarded $ How is yo Response Annual ap Sales tax  Fuel tax o Dedicated   Other sta Clean Air  Departme State Infra Communi Freight M Connect O   r state rail pr  funding sou rant than a lo rcent of the l  a discounted for project pl h state rail p es awarded  2‐$3 million ur state rail  s included:  propriation f   n Class 1 railr  State fundin te funding pr Programs (CM nt of Comme structure Ba ty Block Gran obility Strate regon  ogram award rce it is hard  an especially oans provide  rate. In gen anning.  rogram fund more than $2  a year, based program fund rom General     oads    g    ograms for w AQ)     rce    nk    ts    gic Investme      loans or gra to sustain a l  to short line d by states h eral, most pr ing is awarde 5 million per  upon surve ed?
From page 5...
... Please ran Responde most imp indicates  Rail fundi Are there of railroad Fifty‐seve to state ra k the follow nts indicated ortant object rail is seen as ng to reduce   any legal or  s?   n percent of  il ownership ing rail progr  that rail exp ive. Rail pres  an importan highway con regulatory re the responde , investment  am funding  ansion to sup ervation rank t economic d gestion was r strictions w nts indicated or operation objectives in port jobs an ed third in im evelopment anked as the hich apply to  that there w  of railroads.   order of imp d improve ec portance. R tool to creat  least import  state owner ere no statu Some state s ortance.  onomic deve esponse to th e jobs and bo ant objective ship, investm tory or regul tatutes proh 8 lopment was is question  ost the econ .  ent or oper atory restrict ibit state   the  omy.  ation  ions 
From page 6...
...     acquisitio state own restriction What do  Industrial  projects s Are there Typical an Funding C  Fu 20  M  Fu Ef Program  R "n  R w  A te  M n or ownersh ership positi s which proh state investm rail access, s upported by   any rail prog swers fell int omments: nding needs  years. Secti ore funding  nding is nee ficiency (CRE Limitation C ail is one of fi eed" based  ailroad Rehab hich is a hurd  general lack  rm projects,  andated PTC ip of private  on in a projec ibit the own ents suppor afety program state rail fun rams which  o two catego  to be increa on 130 funds for industrial ded to comp ATE) , Rail Fre omments: ve modes eli infrastructure ilitation and le many app of flexibility i incentivize p  improvemen rail assets. M t. Some state ership of railr t?
From page 7...
... 10   With sufficient funding, more rail programs could be converted to forgivable loans (a forgivable loan can be treated as a grant if volume commitments are met)  based upon performance.
From page 8...
...     Does you   Stakehold state prio question  separately State prog represent r state have r ers reported rities may no because of th  for funding. ram for pub  a multi‐state ail programs  that multi‐st t have the sa e network si  Another mu licly owned ra  benefit.    that extend ate freight ra me emphasis ze. States com lti‐state prog il cars. These  beyond stat il operations . Amtrak ope mented tha ram example  cars can tec e borders?
From page 9...
... Stakehold rail progr The respo user to id objectives Summa The surve passenge  R  P  R  Po  St  C ers were ask am national  nse to this q entify criteria  as well as pr ry y responses a r and freight  ail investmen rograms mus ail Infrastruct or rail infras ate rail prog urrent state p ed to identif database.   uestion illustr  to match th ogram struct re not statis rail programs ts are expens t be flexible d ure is viewed tructure imp rams are des rograms prim y searchable ates a strong e intended pr ure.  Interest tically valid, b  at the state  ive and have ue to the mu  as a building acts safety an igned for pro arily suppor  criteria for a  desire for a  oject. A sear  was greates ut do provid and federal l  a long life cy ltimodal asp  block to a s d regional e jects within t t safety and   federal and flexible searc ch tool will n t in freight fu e insights ab evel. Key find cle.  ect of most r trong econom conomic com he state's jur industrial acc  state passen h tool which eed to be sen nding progra out the curre ings include: ail projects.  y and job gr petitiveness isdiction.  ess projects. 12 ger and freig  will allow th sitive to pro ms.   nt state of    owth.  .      ht  e  ject 

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.