Skip to main content

Currently Skimming:


Pages 139-143

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 139...
... 139 This glossary presents definitions for common terms and abbreviations used throughout the GAM Implementation Manual. Assessment Evaluation of data or other information for the purpose of making decisions or judgments.
From page 140...
... 140 Geotechnical Asset Management for Transportation Agencies, Volume 2: Implementation Manual Corridor A defined or informally designated portion of a transportation system that may be used for planning, operations, communication, or other agency purposes. For GAM implementation, corridors can be designated for areas with concentrations of geotechnical assets and/or risk.
From page 141...
... Glossary and Abbreviations 141 Hazard A hazard is a potential event with adverse consequences. Some hazard events can occur relatively suddenly (e.g., natural hazards like earthquakes, landslides, floods, and so forth)
From page 142...
... 142 Geotechnical Asset Management for Transportation Agencies, Volume 2: Implementation Manual Maturity With respect to asset management, a measure of how advanced an organization is with respect to asset management (e.g., initial, core, or advanced)
From page 143...
... Glossary and Abbreviations 143 Segment A pre-defined inventory length used in the location process for geotechnical assets. In the GAM Planner provided with this manual, a default segment length of 500 feet (approximately 0.1 mile)

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.