... A-1 PDT is a commercial service, non-primary airport that also facilitates UAS landings and takeoffs for the Oregon Army National Guard (OANG) and the Pendleton UAS Range (PUR)
From page 78...
... A-2 Airports and Unmanned Aircraft Systems the PUR (Century West Engineering, 2018)
From page 79...
... PDT Airport Master Plan A-3 Table A-2. PDT airport infrastructure requirements.
From page 80...
... A-4 Airports and Unmanned Aircraft Systems 5 to 10 years unless significant changes occurred to the ANG training operations (Century West Engineering, 2018)
From page 81...
... PDT Airport Master Plan A-5 • UAS Runway (2,800' x 60') ; • UAS Parallel Taxiway; and • UAS Apron." (Century West Engineering, 2018)