Skip to main content

Currently Skimming:

Executive Summary
Pages 1-3

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 1...
... at slightly below the boiling temperature of the solution. The resulting hydrolysate at Aberdeen, which will contain thiodiglycol as the primary reaction product, will be treated by activated sludge biodegradation in sequencing batch reactors to oxidize organic constituents prior to discharge to an on-site federally owned wastewater treatment facility.
From page 2...
... The Army should continue to identify and pursue regulatory approval for waste management facilities to receive off-site shipments of brine from the supercritical water oxidation processing of VX hydrolysate at the Newport Chemical Agent Disposal Facility. However, given the modest cost of the equipment and the significant costs and processing delays that could result if shipping or receiving of the effluent were not allowed or became prohibitively expensive, the capability of processing the brine on site should be maintained.
From page 3...
... Recommendation 5-3. The criteria for releasing VX hydrolysate to subsequent processing steps at the Newport facility should be based on the 99.9999 percent agent destruction level required by the state of Indiana and an evaluation of worker and public risks associated with releases of agent in hydrolysate equal to or less than this destruction level (i.e., 330 ppb)


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.