National Academies Press: OpenBook

Web-Based Screening Tool for Shared-Use Rail Corridors (2014)

Chapter: Chapter 3 - Findings and Applications

« Previous: Chapter 2 - Research Approach
Page 24
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 24
Page 25
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 25
Page 26
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 26
Page 27
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 27
Page 28
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 28
Page 29
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 29
Page 30
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 30
Page 31
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 31
Page 32
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 32
Page 33
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 33
Page 34
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 34
Page 35
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 35
Page 36
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 36
Page 37
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 37
Page 38
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 38
Page 39
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 39
Page 40
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 40
Page 41
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 41
Page 42
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 42
Page 43
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 43
Page 44
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 44
Page 45
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 45
Page 46
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 46
Page 47
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 47
Page 48
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 48
Page 49
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 49
Page 50
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 50
Page 51
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 51
Page 52
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 52
Page 53
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 53
Page 54
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 54
Page 55
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 55
Page 56
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 56
Page 57
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 57
Page 58
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 58
Page 59
Suggested Citation:"Chapter 3 - Findings and Applications." National Academies of Sciences, Engineering, and Medicine. 2014. Web-Based Screening Tool for Shared-Use Rail Corridors. Washington, DC: The National Academies Press. doi: 10.17226/22329.
×
Page 59

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

24 3.1 Introduction and Study Objectives The purpose of this chapter is to summarize the findings from the research associated with developing a Web-based tool to enable states and passenger rail operators to perform preliminary feasibility screening of proposed shared-use passenger and freight rail corridor projects. The screening tool would be intended to • Support preliminary feasibility analysis of rail passenger projects and identify those that warrant further detailed investigation with more rigorous analytic tools. • Help planners assess railroad operations, capacity, and cap- ital requirements of shared-use corridors where publicly funded passenger rail trains are proposed for operation on privately owned freight rail lines. • Assist in preliminary analysis as defined in FRA’s Rail Corridor Transportation Plans: A Guidance Manual (1), focusing on simulating train operations and determining capacity needs. The principal research product from this project is a Web- based tool for screening potential shared-use projects. Before discussing the research findings and applications from the project, it is useful to review the purposes of screening, the practical application of the process, and the features and functions established for the screening tool to effectively meet its objective. 3.1.1 Purpose of Screening The primary purpose of the screening process is to iden- tify potential shared-use projects that have merit and those that do not. During the early stages of feasibility assess- ment, it is particularly important to identify and discard impractical, unfeasible, or cost-prohibitive projects. Doing so will enable planners to focus resources on projects that pass screening. The secondary purpose of the screening process is to provide preliminary estimates of the impacts of a shared-use proposal. Such estimates could be useful for sensitivity analysis, proposal design, preliminary discussions between public agencies and railroads, and deciding what analyses to pursue more rigorously in partnership with freight railroads. A robust tool would address both screening purposes and be broadly applicable at the preliminary feasibility and con- cept phases of planning. As such, the tool would include an integrated set of models with the necessary functionality able to meet either or both of the purposes of screening. 3.1.2 Impacts and Mitigation In screening corridors for shared-use operations, it is seldom the case that passenger trains can be added without impacting existing corridor operations. It would be expected that mitigation would involve at least some infrastructure improvements to maintain overall capacity for freight opera- tions (even if the capacity is currently underutilized) while allowing for forecast freight and passenger traffic growth. The disturbance due to the introduction of passenger service is said to be mitigated if some measure of capacity is shown to be undiminished after adding infrastructure. Capacity can be measured in several ways. The research team identified two relevant approaches. In one approach developed for the Midwest Regional Rail System (MWRRS), the measure of capacity was freight operations delay expressed as the need for additional capacity. In this approach, target delay levels were estimated by simulating freight operations over existing infrastructure in a future forecast year. Mitigation was achieved by adding sufficient infrastructure to maintain freight train delays at the same level, with the additional passenger service. A second approach to capacity measurement was proposed in a 2007 Cambridge Systematics study sponsored by AAR (2) C H A P T E R 3 Findings and Applications

25 (the “AAR Study”). The study suggested an alternative level of service (LOS) definition that follows the Highway Capacity Manual (3) approach, stating that satisfactory arrangements between freight railroads and the public could be reached by maintaining a specific LOS (e.g., C or D or better) through the forecasted time horizon. The approach relied on a slot-based capacity approach (i.e., throughput metric) rather than on a delay metric. In this approach, a reduction from maximum theoretical to practical capacity is accomplished by applying a factor, typically in the 70-80 percent range, to ensure that the level of infrastructure is sufficient to maintain free flow conditions with reasonable (small) levels of train delay. Although a screening tool’s ability to develop project alter- natives is both limited and not necessarily definitive, with careful analysis of the screening tool outputs and the applica- tion of experience, a screening tool could support the process of identifying infrastructure improvements and the likely levels of costs. 3.1.3 Costs Feasibility screening will need to address the cost of pro- posed improvements. Detailed engineering cost estimates are beyond the scope of a screening tool, but an approach that applies unit costs (i.e., dollars per new mile of track, etc.) would be useful for screening. The tool could look at cost feasibility thresholds for proposed projects by examining total improve- ment costs and costs per projected annual passenger-mile. Cost-prohibitive projects would be screened out as infeasible. A simple approach to cost development has been provided with the SU screening tool. 3.1.4 Balancing Ease of Use with Reliability of Results There are several methodological approaches to screening projects for preliminary feasibility. These approaches range from the relatively simple (e.g., rules of thumb, simple analyt- ical models, parametric models) to very complex simulation models. A Web-based SU tool that strikes a balance between ease of application and reliability of results, and is applicable for broad, preliminary screening, yet can offer staged options with refinement, could be very useful. 3.1.5 Input Data The SU tool will need to consider a variety of input data, including the following: • Current infrastructure of the route; • Freight traffic mix data (i.e., level and types of freight operations); • Character of existing and proposed passenger rail operations (passenger traffic mix); • Train schedules (for assessing the degree of interaction between freight and passenger trains); • Forecast freight and passenger growth; and • Unit costs. 3.2 Inventory of Tools In Task 1, Identification of Tools, it was noted that the research team expanded the notion of software tools to include additional methods that have been documented in academic journals and trade publications that address some element of the key concerns of the Web-based tool. The researchers iden- tified five methodological approaches, as follows, in order of increasing complexity: 1. Parametric, 2. Optimization-based methods, 3. Topological, 4. Analytical, and 5. Simulation. The research team cataloged 29 existing software tools and methods, with methods being algorithms, formulas, or techniques that can be incorporated easily as a screening tool component. The research team then assessed the suitability of each approach and tool for possible inclusion in a Web- based tool for NCFRP Project 30. The assessment criteria were as follows: • Does the tool generate a feasibility metric of interest, such as train delay and capacity measure, slot capacity and capacity utilization, or is it relevant in shared-use planning, pre- planning, or decision making? • Does the tool inform with regard to the infrastructure and traffic conditions of the specific corridor or route under consideration and reasonably reflect actual and forecast train volumes and traffic mix? • Are the data requirements excessively onerous or difficult to satisfy? • Does the tool inform with regard to the interaction of freight and passenger trains and support the identifica- tion of areas of conflict or bottlenecks (including with the added infrastructure) and likely levels of delay and reliability? • Does the tool have significant barriers to use (e.g., propri- etary restrictions or excessive training requirements)? • Is the tool used and accepted in the rail industry? • Is the tool “upwards compatible” with more detailed assess- ment conducted in later stages of project development?

26 The next section summarizes findings from the inventory of tools and methodologies. 3.2.1 Parametric Approaches Parametric approaches use empirically calibrated formulas rather than equations derived from first principles to estab- lish relationships between infrastructure, train volume, traf- fic mix, delay, and capacity. The best-known example of this class of model is the 1975 Peat, Marwick, Mitchell line capac- ity study (4). More recently in 2009, Dingler et al. (5) devel- oped a parametric study of traffic heterogeneity by using the Berkeley Rail Traffic Controller simulation model. Also in 2009, Lai and Barken (6) updated the Peat, Marwick, Mitchell formulas. Parametric analysis embodies general relationships reflect- ing the nature of line capacity and train delay. For example, a key finding of the Peat, Marwick, Mitchell study was that train delays actually increase when bi-directional signaling and power crossovers are added to a double-track line. This occurs because the added operational flexibility allows high-priority trains to overtake and pass low-priority trains. These overtakes cause more delay for the low-priority trains. Although parametric approaches are valid in a general sense, they are only reflective of the line configurations for which the relationships were calibrated. As such they do not reflect the specifics of the local infrastructure and traffic conditions. In addition, the regression equations themselves are based on the “typical” conditions for which they were calibrated, which may not be reflective of the particular rail line or segment under consideration. Finding: Parametric tools, while requiring minimal data, are not sufficiently robust for corridor screening assessment. 3.2.2 Optimization Approaches Optimization has had two main applications. Some algo- rithms have been developed for direct application to real-world train dispatching problems, whereas others have been proposed for “office use” as embedded optimizers in simulation models. A key reason for incorporating optimization capability into simulation models is to improve the performance of the mod- el’s train dispatching algorithm. Kraft (7) noted that existing local optimization algorithms tend to bunch trains into fleets, whereas in validation comparisons it has been found that human dispatchers often try to maintain spacing between following trains. Once fleets have formed, local optimization algorithms do a poor job of efficiently meeting the fleets to minimize train delay. Human dispatchers minimize the complexity of their problems by minimizing bunching in the first place. As a result, a case does exist for incorporating optimiza- tion into a simulation framework to more accurately replicate dispatcher behavior. However, the question persists: When is there too much optimization? For example, the RAILS2000 Web site (8) states that their model “is logic based, with opti- mizing capabilities deliberately restricted to emulate real-world limitations of train dispatching.” Two well-known models that incorporate optimization are the Schedule Analysis (SCAN) System developed at the University of Pennsylvania (9) and Sauder and Westerman’s (10) optimization. Both were developed for real-time dis- patch center applications. The early impetus for development of the SCAN System was in support of Burlington Northern’s Advanced Rail Electronic System (ARES), an early Positive Train Control (PTC) project (11). It is important that the Web-based screening tool assume realistic train dispatcher capabilities. To the degree that a sim- ulation may incorporate limited (embedded) optimization, it could be appropriate for replicating train dispatcher behav- ior and improving the lock-up performance of the algorithm. The optimization should not be taken to such an extent that it exceeds human dispatch capabilities or computationally bogs down the algorithm and inhibits the ability of the user to get a quick response from the software. Optimization approaches have had two primary applications: for improving train dispatching in a real-time setting and for more accurately replicating human train dispatcher behavior in a simulation modeling context. Some optimization programs have been deployed as “dispatching engines” inside commer- cially available simulation models. Their data requirements are essentially the same as those for simulation models. The computational intensity of optimization can increase solution time and make the approach even less suitable for a screening application than a simulation approach would be. If the performance of the optimization exceeds that of a human dispatcher, the tool may not properly represent practical capabilities in a day-to-day operating environment. As a screening tool, there is a serious risk that an optimization- based assessment could reduce train delay to the point that it underestimates infrastructure requirements. Although some optimization may be appropriate within a simulation mode, it should be used only for the purpose of replicating human dispatch capabilities, not exceeding them. Finding: Optimization-based tools are overly complex for corridor screening. Issues relating to algorithm performance and efficiency, combined with the need to customize programming for each corridor, render tools of this type unsuitable. 3.2.3 Topological Approaches This class of models attempts to directly assess the capac- ity of a rail line based on the concept of schedule “slots.” The

27 simplest representative of this class of model is the well- known equation for estimating the capacity of a single-track rail line: C T -= 12 ( )Equation 3 1 where C = the capacity of the line in trains per day, each direction T = the running time of the single-track segment, in hours It is easy to extend this capacity framework to develop tables of slot-based capacities for both single and multiple tracked rail line. Such tables have been used by U.S. freight railroads as the basis for their own corridor capacity screening. The AAR Study (2) implemented a nationwide screening assessment of U.S. rail capacity. As a national study, it employed a very broad and general approach to capacity assessment. Even so, the study pioneered some new methodological approaches that could still be applicable to the future development of a rail capacity screening methodology. The AAR Study proposed a simple table-based method- ology for screening freight capacity needs. In common with topological methods, the AAR Study used factorization to reduce capacity from maximum theoretical of 1.0 to a practical target value. The AAR Study adopted a throughput-oriented view of capacity that is consistent with a topological approach. Table 3-1 shows the proposed LOS grade definitions for rail lines and the associated ratios of volume to capacity. This research suggests that a practical capacity would be 70 percent of a rail line’s maximum throughput capacity, or LOS Grade D. To develop a line-specific measure of maximum throughput capacity for a U.S. freight rail application, Kraft (12) developed an approach for assessing the “jam capacity” of a single-track rail line. A simulation was used to measure the throughput capacity of a line in a fully saturated condition. Recently, European railroads have made very extensive use of topo- logical methods. The International Union of Railways in UIC Code 406 (13) provides a detailed compression-based method- ology for enabling infrastructure managers to carry out capac- ity calculations—following common definitions, criteria, and internationally accepted methodologies. Under compression, starting with a simulated or actual time- distance diagram, all single train paths are pushed together up to the minimum theoretical headway according to their timetable order, without adding any buffer time. During the compression process, neither the running times nor the given overtakings, crossings, or station dwell times may be changed. For a corridor, the compression is sequentially done for each line section in turn, until all segments of the corridor have been scanned, and the most limiting section is found. UIC 406 com- pression is generalized for both single- and multiple-track lines. UIC methodology has been implemented in software packages such as the MOM system (14-15), which has been extensively used for assessment of European line capacity issues. In this regard, they provide similar functionality to the MWRRS Ideal Day approach because topological approaches identify loca- tions where infrastructure needs to be added. Topological methods are not evaluative because they do not establish the feasibility of operating a specific set of train schedules, as a simulation can. Topological methods are more oriented toward ensuring that the overall level of infrastruc- ture is sufficient to meet the capacity needs without regard to specific train schedules. Topological methods show promise and can generate useful metrics. The software development required to implement this approach would be too costly to undertake in the Web-based tool as part of this project. However in the future, compression functionality could provide a useful add-on capability to the shared-use capacity screening tool. Source: American Association of Railroads Table 3-1. Volume-to-capacity ratios and level of service (LOS) grades.

28 Finding: The main advantage of topological approaches is their ability to identify directly the bottleneck section(s) of a rail line, pointing directly to the locations where infrastructure additions may be the most needed. 3.2.4 Analytical Approaches Probability-based delay equations are a type of model that develops algebraic relationships from first principles that describe how trains interact as they move along a line. These models have been developed mostly for the case of opposing train interactions on single-track lines, although relationships can be developed for multiple-track systems as well, where overtakes are the primary cause of train interference. One of the best-known models of this class is the over-the-road delay model by Petersen (16). A survey of early analytical models was provided by Kraft in 1988 (17) comparing the results to topological, simulation, and optimization-based approaches. These early analytical models only measured average train delay and assumed a uniform distribution of train arrivals and departures throughout the day. Later models developed by Harker and Hong (18) and Hallowell (19) incorporated specific train schedule information for developing target arrival times needed by a particular optimization-based approach (20) and were tested in conjunction with that tool. Like a parametric approach, analytical models estimate train delay and capacity using equations. However, analytic equations are derived from first principles based on probability theory, so they reflect direct cause-and-effect relationships. As a result, although analytical models do aid in understanding cause-and-effect relationships, it is difficult for simple models to adequately represent the full complexity of the railroad operating environment, especially as traffic volumes rise. Analytic models such as probability-based delay equations can be customized to local conditions (e.g., the exact length and running time of each line segment), but the equations only reflect the specific kinds of train interactions for which they were developed. Most models are limited to one-on-one train interactions and are typically developed only for single-track or other simple configurations. Analytic equations work rea- sonably well for light traffic conditions, but as train volumes increase, there is a tendency for this class of model to under- estimate train delay—sometimes by a significant margin. For MWRRS conceptual and feasibility planning, TEMS developed the RightTrack™ system. RightTrack™ provides two methods for capacity assessment: a high-level Ideal Day assessment that is an analytical approach and a more detailed Typical Day assessment based on simulation. The Ideal Day Analysis (21) consists of a straightforward review of potential conflicts and train meets (i.e., locations) where trains would pass each other if adequate track capacity were available. By counting the number of locations where meets occur (other than at sidings) an estimate can be developed of the number of sidings that may need to be added to support passenger trains. This is an example of a straightforward analytical approach that can directly derive infrastructure requirements from a direct analysis of a time-distance diagram. In its initial form, the methodology was based on an idealized time-distance diagram where trains run on a strict timetable. Analysts were given some leeway to manually consolidate con- flict points that were close together. For example, if conflicts (identified visually as red balls) occurred within a few miles of one another or close to existing meet/pass infrastructure, these conflict points would be combined. (This is the origin of the “Conflict Threshold” parameter that appears at the bot- tom of the SU string line display.) Originally, this consolida- tion was done manually by an experienced analyst. Finding: The approach of adding a siding wherever a conflict occurs is a reasonable first-cut assessment of infrastructure needs on light-density corridors. The original method was limited to light-density corridors and needed an experienced analyst to combine close together conflict points. Both the density limitation and subjectivity of the consolidation process could limit the broader applicability of the methodology. However NCFRP Project 30 research has developed a new approach for broadening conflict identifica- tion’s applicability. For each route segment, the new approach is to count the total number of conflicts and then divide by the number of passenger trains to calculate the average num- ber of conflicts per passenger train. As demonstrated by the case studies, this methodological enhancement enables extension of the methodology to high- density corridors. It also removes the subjective aspect of the former Ideal Day approach. Finding: The proposed conflict identification methodology is both quantitative and rigorous and is applicable to all corridors regardless of density. The methodology does not require an expe- rienced rail analyst, and it qualifies as an effective element in a corridor screening tool. 3.2.5 Simulation Approaches Simulation models are well appreciated for their detail, openness, and visibility of results, as well as for their ability to readily incorporate detail, such as specific train dispatch- ing rules, that would be very difficult to incorporate into an analytical or equations-based model. The ability to practically replicate real-world operations gives the simulation a great deal of credibility. Detailed outputs, including time-distance dia- grams and animations, are used to explain results to rail man- agers and overcome “black box” concerns. Modern simulation models have very sophisticated and user-friendly graphics that both aid input of track and infrastructure data and—with visualization—ensure the network is properly constructed

29 and interconnected. Contemporary simulation models also facilitate displaying, zooming, and scrolling time-distance dia- grams and have sophisticated and high-quality animations. These advantages have made simulation a preferred approach among many rail practitioners. Examples of simulation tools include Berkley’s RTC (22), SYSTRA’s RailSim (23), FRA’s GTMS (24), TEMS’ Miss-It™ (part of the RightTrack™ System) (25), CANAC’s RAILS2000 (26), Canadian National’s Route Capacity Model (27), ALK’s Line Capacity Analysis System (28), and the Rail Sciences Model, which was subsequently repack- aged as the Fast Track II module (29) of Oliver Wyman’s Multi- Rail (30) rail planning suite. Simulation methods are designed primarily as evaluation tools to verify the operational feasibility of any train operat- ing plan and to assess the likelihood and locations of related train delays. Use of the tools can be demanding to ensure that current operations are adequately represented and validated to serve as a baseline for comparison. However, simulation provides key operational feasibility information even in the absence of an exhaustive level of detail. Simulation models are evaluative tools because simulations can only assess the options that are given to them and cannot by themselves derive new solutions. Development of the solutions is normally left to experienced analysts with deep knowledge of rail operations. However, simulation methods can be aug- mented by other approaches, such as conflict identification or topological methods that have the ability to derive solutions. In the more advanced phases of planning, detailed engi- neering studies along with extremely accurate simulations are required. These analyses include a level of detail of both the infrastructure and operating plan down to the level of individual switch and signal. However, the goal of simulation in the screening phase is not to develop a painstaking replication of operations with the expectation that the railroad will concur with its findings. The purpose of simulation for screening is twofold: (1) to develop a reasonable baseline of operational conditions in the corridor that will support an understanding of key issues in the cor- ridor and (2) to validate and test the operational feasibility of any solutions indicated by conflict identification or topo- logical methods. A simulation in the project screening phase demonstrating that a solution is operationally feasible is a necessary (though not sufficient) condition that a solution is indeed feasible. Simulation analysis adds substantial cred- ibility to an analysis. However, planners should recognize that railroad operations are complex, and simulation findings— like all preliminary analysis—may not withstand the scrutiny of more detailed analysis. There are a number of concerns and caveats regarding simulation models. The performance of the dispatching algo- rithm is a concern with some models. Rail line simulation models are well known for their tendency to either “lock up” or produce results that do not reasonably reflect the performance of real-world dispatching systems. The results must be carefully inspected and monitored and sometimes “tweaked” by an ana- lyst to get the model to perform adequately. All this effort to collect and check detailed input data along with careful analysis of the outputs (to ensure that the dispatching is advancing or holding trains appropriately) can be very expensive and time consuming. Working with the models can be a very labor- intensive effort requiring a skilled analyst. However, these challenges increase with the complexity and density of the corridor under consideration. The concerns and caveats that apply to simulation apply equally to other methods when considering highly complex, densely trafficked corridors. Simulation-based methodologies can be used to assess line capacity and train delay. The performance of the dispatching algorithm must be well understood and subject to limitations to ensure that it will function reliably (e.g., not lock up in daily use). It must be possible to quickly execute the model to obtain answers with a reasonable level of analyst effort, both for set- ting up data and for running the model. Finally, the model must be sensitive to the issue of statistical convergence and generate a large enough sample to satisfy usual and custom- ary requirements for the statistical convergence of its output. Finding: Simulation is the key validator of a screening assess- ment. The data requirements for a simulation are the same as those of the conflict identification methodology. Given robust train movement and dispatching algorithms, simulation provides essential information regarding operational feasibility, and, therefore, is a critical component of the screening assessment. This capability is provided as a core feature of the SU tool and has been demonstrated in the case studies. 3.3 Potential Relevance of Tools The research team’s review of tools and methodological approaches informed the assessment of their relevance to the proposed SU Web-based tool. First, successful screening methodologies should include the following attributes: • Be simple, easy to use, and responsive. • Have statistically valid results, including a sensitivity assess- ment of the error margin induced by any defaults associated with missing data. • Have manageable data requirements that are commonly available at early stages of project development. • Enable development of a site-specific assessment that is particular to the corridor under consideration. • Use an accepted methodology and be practical to implement under real-world operating conditions, within an acceptable error margin, for a screening analysis.

30 The research team also noted the following findings regard- ing relevance to a Web-based SU screening tool: • Possible viable approaches include analytic, topological, and simulation-based tools. – Simulation is an evaluative approach that can assess the effectiveness of capacity solutions that have been defined for it. Simulation is, however, a very sophisticated and potentially expensive approach requiring the skills of an experienced analyst. – In conjunction with simulation, analytical or topological approaches could add an auxiliary capability for suggest- ing possible locations or quantities of added track needed to satisfy capacity requirements. These capabilities could be implemented into the Web-based screening tool as optional “wizards,” time and budget permitting. • In general, parametric tools, as well as analytic train delay models, have been excluded for further consideration because they do not have sufficiently site-specific analytic functionality. • In general, optimization tools have been excluded because of their complexity and a concern that their dispatching logic may exceed real-world capabilities. This does not, however, exclude incorporating a limited optimization capability within the dispatch logic of a simulation model to emulate the look-ahead capabilities of a human dispatcher. Of the 29 software tools and methodologies identified in Task 1, the team found the following 3 as most relevant: • GTMS—Developed by DecisionTek for FRA to assess PTC safety plans. This software could be made available and adapted to the Web screening application. • RightTrack™—Developed by TEMS, the software has been extensively used for operational assessment of capac- ity issues in the Midwest, Ohio, Florida, and elsewhere. It includes TRACKMAN™, a graphical infrastructure editor; LOCOMOTION™, a train performance calculator, and MISS-IT™, a detailed event-oriented train dispatch simu- lation. The software could be adapted for the Web-based screening application. – Ideal Day methodology (31), categorized as an analytic approach, was initially implemented using the Right- Track™ tools for MWRRS. It was applied in light-to- medium density shared-use corridors where baseline freight train delays are minimal. One advantage of this approach is its simplicity. Although not initially scalable to complex or high-density evaluations, this limitation has since been addressed. • UIC compression methodology—Categorized as a topo- logical approach, compression can identify infrastructure needs based on an assessment of theoretical and practical capacity within defined time windows. It also can provide an auxiliary slot-based capacity measure and delay-based measures. 3.4 Data Requirements and Gap Analysis In Task 2, the researchers looked at the data requirements for the inventoried software and methods discussed in Task 1. The research team noted that, in addition to the prelimi- nary data that establishes a context for feasibility screening, the following three main types of data are needed for corridor capacity screening analyses: • Infrastructure data; • Traffic data, which is often difficult to obtain and includes forecast train movements (i.e., schedules) by type of train, trains, and their consists; and • Cost information, which may be obtainable from published sources or can be developed in house or through consultants. 3.4.1 Preliminary Data As noted, preliminary data establishes a context. It includes a general description of the corridor rail system, its entry and exit points, stations, and timetable routes available in the cor- ridor. The best sources for preliminary contextual data are the railroad employee timetable document(s), which may be obtainable from the railroad. 3.4.2 Infrastructure/Rail Facility Data Infrastructure data, also referred to as rail facility data, describes the corridor’s physical facilities. This would include core infrastructure and its properties (i.e., track, switches, elevation points, heading points, speed zones), traffic con- trol equipment (i.e., signal systems, interlocking and wayside equipment), and ancillary built features (i.e., bridges, tunnels, and grade crossings). Although track charts can be useful data sources, they are often incomplete, out-of-date, or unreliable in other ways and hence insufficient for characterizing infrastructure. The more reliable alternatives are photogrammetric imagery, GIS databases, and field inspections. These have proven invaluable for collecting rail system infrastructure data. The following data sources may be available from the rail- roads on request and should be sufficient to characterize the rail facility: • Track survey data, • Track charts, and • Field inspections.

31 The following sources are publicly available and can be used to directly determine or infer a corridor’s rail facility data in lieu of or supplementing the sources listed above: • U.S.DOT FRA GIS 1:100000 Rail Network Database (source: BTS); • Oak Ridge National Laboratory Center for Transportation Analysis Rail Network Database; • U.S.DOT FRA Highway-Grade Crossing Database (source: Office of Safety Analysis); and • Google Earth™ (used to cull and visualize the information provided by the databases above). Track Survey Data Track survey data, prepared by survey teams, describe the rail physical infrastructure including inventory and physical location of track and rail and traffic control facilities. Track survey data also include distances, elevations, headings, and exact boundaries of speed limits. Track surveys are the best data source because they contain the precise measurements made by an on-the-ground survey team. Unfortunately, most of the existing track in the United States has not been surveyed recently, if at all. Track surveys are expensive to conduct and the railroads typically undertake them in advance of major improvement planning. With a recent track survey in hand, there would be little need for additional validation of rail facility data. If such a survey exists and the railroads are willing to provide the survey data, then the track survey data should be sufficient to conduct the analysis. Track Charts In theory, all the infrastructure attributes needed for a screening-level capacity analysis could be identified from a high-quality railroad track chart and employee timetables. In practice, however, track charts have some practical limitations. Consequently, it has been found more effective to couple the use of track charts with other sources—particularly field surveys and photogrammetry—to confirm the track chart data accu- racy or to bring it up to date. In the experience of the research team, track chart data is highly variable in its quality. Some track charts are highly accu- rate; others are not. Because the methods for producing track charts have changed so much over the years, it is difficult to generalize about track chart data accuracy. In the past and before modern computer methods, track charts were typically compiled from field notes of local engineering personnel. Older track charts were drawn by hand and generally showed curves, grades, and track config- uration. Beyond this, the data elements were highly variable with regard to bridges, culverts, grade crossings, speed limits, crossings of other railroads, and other physical features of the line. Some old charts are not only inaccurate, but very hard to read because of manual preparation. A common problem with track charts is that the distance between mileposts is not exactly 1 mile. Also, there are often significant deviations that are not indicated on the charts. These issues can be resolved using satellite photogrammetry and GIS data, to establish the exact length of each line segment and how different segments join one to another. Old charts, however, can be useful as a practical matter to indicate the existence of former rail facilities that may not be in place any longer. For example, a line may have had a double track in the past. Because the track bed is usually still intact, the old track bed could be reused. This would reduce the cost of adding capacity to the line. Thus, it is often helpful to have multiple generations of old and new charts available for the same line segment. Newer charts are not necessarily more accurate than old charts. Discrepancies between charts can be resolved by current satellite photogrammetry and field verification. Field Inspection A field inspection of corridor infrastructure is an essential component of the data collection process. For the purpose of a concept or feasibility-level assessment, a field inspection consists of limited site verification from publicly accessible locations. In such an inspection, the field inspection team would observe a sample of critical locations along the track from public crossings, bridges, and stations. Typical field observations are conducted at, or from, highway/railroad crossings, overpasses, and parallel roadways. At each location, engineering notes are compiled and the physical track con- ditions compared to the latest track charts and to any other information that may have been provided by the railroads. These inspections focus on the condition of the track and its ability to handle joint freight and passenger train operations. The railroad right-of-way needs to be examined as well for its ability to accommodate additional tracks for added capacity. Where possible, other existing facilities are observed, including bridge conditions, vertical/horizontal clearances, passenger train facilities, railroad yards, and terminal operations. Photo- graphic records should be made at many locations. Use of Other Sources A data collection process composed of a corridor infra- structure field inspection and the associated track charts can partially fulfill the rail facility data needs listed above. Track charts and field inspections provide a general description of a corridor system that includes track positions and stations.

32 This method of data collection does not provide sufficient detail to determine system entry and exit points or timetable routes. To fulfill the preliminary data requirements listed above, the data collection process discussed in this section will have to supplement other sources of rail infrastructure data. This can be accomplished by augmenting track charts and field inspections using satellite photography and GIS data, which is described at length in the following sections. FRA GIS 1:100000 database. The U.S.DOT FRA GIS 1:100000 Rail Network (FRARN) from BTS is a geographi- cally based representation of the North American railroad network. It was designed and is continuously updated by BTS to support analytic transportation studies. The North American rail system is represented in FRARN as a standard link-node network, and the data is stored in multiple GIS shape files. FRARN contains data for all track segments and their char- acteristics, such as length, ownership, and the subdivision to which the track belongs. The database does not include the milepost range, but often this can be cross-referenced from other sources, notably the FRA Grade Crossing Database. Oak ridge national rail network database. The Oak Ridge National Laboratory (ORNL) Center for Transporta- tion Rail Network database is a geographically based repre- sentation of the North American railroad network, based on the U.S.DOT FRA GIS 1:100000 Rail Network (FRARN). It was designed and is continuously updated by ORNL’s Center for Transportation to support analytic transportation studies. The data is stored in multiple GIS shape files. The ORNL network is derived from the FRARN database and boasts a reduced, more simplified set of rail network data. FRARN includes more detail in its description of industrial spurs, yard connections, and sidetracks, but this data is often unused, and its presence complicates the process of identify- ing mainline track segments. Consequently, it has been found that the ORNL network is a more appropriate database for profiling a corridor’s infrastructure. The 2007 CS Study (32) used the ORNL network (Version 5-5) to develop its primary corridor network model. FRA national grade crossing inventory. The U.S.DOT FRA Highway-Grade Crossing Database, available from the Office of Safety Analysis, was established for the purpose of making railroad safety information readily available for ana- lytic transportation studies. The database provides geographic, infrastructure, and traffic information for all highway-grade crossings in the United States. This information can be used in conjunction with the FRARN and ORNL databases to map track segments and switches to railroad, division, subdivision, and milepost information. Google Earth™ visualization. The FRARN and ORNL databases contain shape files that describe the geometric and geographic properties of track segments. These shape files can be transformed into KML files (33) and imported into Google Earth™ where they can be superimposed onto the appropriate aerial photography. This visualization tool cross- references multiple sources of information by simultaneously overlaying different KML files. Finding: Table 3-2 summarizes the availability of infrastruc- ture data and their sources. Because existing infrastructure is usually clearly visible in Google Earth™ satellite imagery, this can be considered a pri- mary source of existing infrastructure data. Often current track charts are publicly available or available on request from the freight railroad. 3.4.3 Traffic Data The required traffic data is divided into two types: train schedule data and train consist data. Train scheduling data is proprietary information and is regarded as commercially sen- sitive to railroads, but schedules can be inferred using several publicly available sources. Train consist data, which in some cases also is kept private, can be developed through such tech- niques as direct observation at public grade crossings. Train Schedules Train schedules are an essential component for a capacity analysis because they provide information about traffic volume and the mix of freight and passenger trains. Passenger train schedules are publicly available and easy to obtain. Freight train schedules, however, are not easy to obtain because they are usually proprietary due to their commercially sensitive nature. Freight train schedules can be determined or inferred through some publicly available databases. Train volume. The only public source for train volume, hour-of-day train operations data, is the FRA Grade Crossing Database. This database can be used to establish the relative proportion of daytime/nighttime operations, but it cannot be used to determine the traffic mix. The Grade Crossing Data- base reports timing in 12-hour windows and provides other useful information, such as freight train count data by location. Simulated train departures could be randomly generated or “seeded” in a screening model using train volume counts oper- ating within predefined time windows. Train departures could be randomly generated across all train types within 12-hour windows, to reflect the relative distribution of daytime and nighttime operations. Data on the timing of train operations, train volumes, train makeup, and traffic mix also could be collected by trackside

33 survey and used to supplement the traffic volume data from the FRA Grade Crossing Database. Traffic mix. Traffic mix can be inferred using the two following publicly available sources: • U.S.DOT Surface Transportation Board’s (STB) Carload Waybill Sample, and • U.S.DOT STB’s Uniform Rail Costing System. The STB Carload Waybill Sample can be used to estimate current corridor volumes based on loaded car movements. Data from the STB Uniform Rail Costing System (URCS) is used to estimate empty car movements. The 2007 CS Study (34) determined traffic data using the STB’s 2005 Carload Waybill Sample and URCS. Access to the data is restricted and governed by STB procedures (35), but state DOTs are authorized requestors for use in state rail planning and other public planning purposes (36). Train Consist Inventory Data The Web-based tool facilitates the process of building trains by providing an inventory of locomotives, cars, and car types. This data is categorized as equipment specification and equipment classification. Equipment specification. Equipment specifications can be found on manufacturers’ Web sites, third-party Web sites, and railfan sites. The following sources include technical bul- letins and general specifications for locomotives and cars: • PCC Logistics Rail Cars Specifications: http://www.pcc logistics.com/specs/rail.html • World Trade Ref Guide to Railcars: http://www.world traderef.com/WTR_site/Rail_Cars/Guide_to_Rail_Cars.asp • Locomotive Specifications (railfan site): http://www.geocities. ws/guilford_350/index-2.html Equipment classification. The inventory of cars pro- vided by the Web-based tool will be classified by type using the car type codes developed by the Association of American Railroads (AAR). Each car code consists of a letter followed by three numbers. The letter identifies the general equipment or trailer/container type and the numbers provide specifics about the size, capacity, and other features of the car. The numeric coding changes according to the equipment type. The codes are explained in the AAR section in the back of the Official Railway Equipment Register, which later became part of the UMLER Data Specification Manual. See Table 3-3 for a sample of railroad car types. Finding: Table 3-4 summarizes the availability of traffic data and sources. Generally, traffic data can be derived from the FRA National Grade Crossing Inventory (caveat: some data may be outdated) and/or from direct field observations of trains moving past highway-grade crossings. Sometimes the needed data has already been captured by a state rail planning effort or a Data Category Data Required Potential Sources Preliminary General description of the corridor rail system Subdivision Time Tables (obtainable with permission from the railroads) Track Charts Field Inspection Reports U.S.DOT FRA GIS 1:100000 Rail Network Database (BTS) Oak Ridge National Laboratory Center for Transportation Analysis Rail Network Database U.S.DOT FRA Highway-Grade Crossing Database (Office of Safety Analysis) Google Earth™ Visualization System entry and exit points Stations Timetable routes Infrastructure or Core Rail Facility Track (segments) Switches Elevation Points Heading Points Speed Zones Traffic Signal systems Interlocking and wayside equipment Ancillary Bridges, tunnels, and other structures Yards Grade crossings Table 3-2. Data requirements and potential sources.

34 cooperative freight railroad might be willing to supply the needed traffic data on request. 3.4.4 Infrastructure Costs Experience indicates that it is highly likely that additional infrastructure or upgrades will be required to accommodate the needs of both freight and passenger operations. Although the capacity screening tool will focus mainly on identify- ing the need for physical infrastructure improvements, ulti- mately there will be a need to develop cost estimates both for freight railroad negotiations and budgeting/planning purposes. Often, very preliminary estimates can be developed by benchmarking costs against other projects. However, once a list of specific improvements is developed, then a unit-costing approach is a more accurate and customary method. In initial feasibility-level planning, infrastructure costs are developed using broad categories of costs with large contingency factors. As the planning progresses and further detail is developed, these costs are further refined. Feasibility-level infrastructure unit costs are appropriate for developing preliminary cost assessments. Such baseline costs are available from many published rail feasibility studies. One example is the Rocky Mountain Rail Authority (RMRA) High-Speed Rail Feasibility Study (37). Appendix E of that study gives a detailed listing of the unit costs employed and shows how they were applied in cost estimation. The RMRA study also included 28 percent for “soft costs” and an additional 30 percent as a contingency factor. Similar cost information for intercity and commuter rail systems is available from other studies and analyses. The key to the accuracy of a unit-costing approach is to ensure that the cost database appropriately reflects the local market costs for the key inputs (i.e., labor, materials, and equipment). A means for keeping the cost database up to date and regionalizing the factors will be a key requirement for development of any future costing functionality that may be created as an adjunct to the capacity screening tool. Appen- dix F of the RMRA study explains how this can be done using the Producer Price Index (PPI) and Engineering News Record (ENR) indices. Traffic Data Data Required Source Train Schedules Train Volume U.S.DOT FRA Highway-Grade Crossing Database from the Office of Safety Analysis U.S.DOT STB Carload Waybill Sample U.S.DOT Surface Transportation Board’s Uniform Rail Costing System Traffic Mix Train Consist Data Equipment Specification http://www.pcclogistics.com/specs/rail.html http://www.worldtraderef.com/WTR_site/Rail_Cars/ Guide_to_Rail_Cars.asp Equipment Classification http://eaneubauer.ipower.com/type.pdf Table 3-4. Traffic data requirements and sources. Car Type ID AAR Car Type Code Car Type Description 1 A405 50-foot box car, equipped, cushioned, 10' plug door 2 A603 60-foot box car, equipped, cushioned, sliding door(s), opening 11' + 23 H351 Hopper, unequipped, three+ hoppers, single rotary coupler, 185,000 lbs+ load limit 26 K342 Hopper, equipped, double rotary coupler, 185,000 lbs. load limit+ 10 C112 Covered hopper, 3,000-3,999 cubic foot, gravity outlet 11 C114 Covered hopper, 5,000 cubic foot+, gravity outlets 24 J311 Coal gondola Source: http://eaneubauer.ipower.com/type.pdf Table 3-3. Sample railroad car types.

35 Finding: Unit cost data is available from other studies, but will require adjustments for inflation and regional conditions. 3.5 Case Studies: Corridor Selection and Key Findings For evaluating the SU tool developed with this project, the research team proposed five potential shared-use corridors, each with different levels of commuter, intercity, and freight traffic. The NCFRP Project 30 Panel asked that • The proposed corridors reflect a mixture of low-volume and high-volume, commuter and intercity passenger rail corridors; • There be data available to validate the study findings; and • The case studies provide a sound basis for demonstrating the SU tool capabilities. The five proposed case study corridors included the features listed above. Moreover, each corridor exhibited unique fea- tures that demonstrated the capabilities of the SU tool. These corridors typified examples of specific passenger and freight integration challenges likely to occur elsewhere as shared-use operations expand throughout the United States. The proposed Northeast Corridor case study also dealt with high-speed rail integration. In all, the five proposed case studies covered the full range of opportunities for passenger rail development—from commuter rail through 110-mph comingled systems. Table 3-5 presents the five corridors proposed for consideration. From these five, three corridors were selected for further detailed study. The selected corridors displayed a tendency toward higher density corridors that would “stress test” the con- flict identification functionality of the SU tool. Consequently, the three corridors selected (Numbers 2, 4, and 5) are among the busiest rail corridors in the United States, and they all include highly complex train operations over predominately multiple-track territory. While the selected case study corridors did “stress test” the SU tool and its computer algorithms and methodologies, the level of complexity that state DOT users would encounter is likely to be much less. For example, the proposed Midwest Regional Rail System (MWRRS) consists of nine light-traffic corridors and three heavy-traffic corridors. Two of the heavi- est trafficked corridors (Chicago-Milwaukee and St. Louis- Kansas City) were selected for case studies, but none of the nine lighter density corridors. The lighter density routes are actually more typical. The selection of only high-volume corridors posed a chal- lenge. The three selected case study corridors were extremely complex simulations and as such, are not ideal “demo” corridors for state DOT planners to learn how to use the tool. It was necessary for the research team to develop new approaches to extend the range of conflict identification functionality so it would be effective on both low- and high- volume corridors. The three NCFRP Project 30 case studies extend the meth- odology for application to high-volume corridors. These three case studies are detailed in the Task 8 reports and are summarized in the following sections in this chapter. 3.5.1 Overview of Proposed Screening Methodology The SU tool is designed for preliminary screening of pro- posed projects that introduce new passenger service to exist- ing freight or shared-use corridors. The tool is intended to be used very early in the planning process where it offers a rigorous, systematic approach for establishing a framework or starting point from which more detailed discussions and analyses can follow. The methodology is consistent with Table 3-5. Five corridors proposed as case studies.

36 the requirements of the FRA Guidance Manual (1) and the analysis is limited by the level of data that is either publicly available or that can be obtained by state DOTs for screening capacity needs. Figure 3-1 illustrates the SU tool workflows as follows: • Step 1 (the “do nothing” baseline) uses the SU simulator to establish a base level of freight train delay reflecting current conditions before any additional passenger service is intro- duced. If there is an existing passenger service, that should be included in the simulation of the base line operation. • Steps 2 and 3 add passenger trains to the existing infrastruc- ture. The assessment is based on the proposed new passen- ger schedules, operating with freight trains over the existing infrastructure. The conflict identifier “red ball/green ball” display is used in these steps to identify the level of added infrastructure that may need to be added to the corridor. Although the conflict identifier can assess likely infrastruc- ture quantities (e.g., miles of track needed) and approximate cost, it cannot determine the specific infrastructure locations. This is because changing the train schedules will shift the locations of the meets and passes that occur along the line, so the sidings would be recommended in different places depending on the schedules. A more detailed engineering- based assessment is needed to do this. However, some rules of thumb can provide general guidelines as to where infrastructure should be placed, so the design will not be too closely linked to one specific train schedule—rather, per FRA guidance, the infrastructure layout should be flex- ibly designed for robust performance under a wide range of operating conditions. The use of these rules of thumb helps accomplish this. • Step 4 adds the recommended infrastructure along with passenger trains and runs the simulator module a second Figure 3-1. SU tool workflows.

37 time. The simulator needs to test a specific infrastructure plan to see whether freight train delays have increased or decreased from baseline levels and to ensure that delays remain at acceptable levels. If the simulation shows that the proposed level of infrastructure is inadequate, then the capac- ity plan must be further refined until the simulations show that train operations are fluid and that proposed investments are reasonably utilized. Steps 1 and 4 are optional enhance- ments to the basic screening methodology, which is actually implemented by the conflict identifier Steps 2 and 3. An important distinction is that of a pro forma versus a detailed operational schedule. A pro forma train schedule is only an input for developing the infrastructure plan and reflects an idealized aspiration for the service. In particular, a pro forma schedule developed before the infrastructure has been laid out cannot reflect actual train meeting locations. Pro forma sched- ules provide a starting point for development of an infrastruc- ture plan, but after the infrastructure plans are detailed, the schedules need to be fine-tuned to ensure that meets are occur- ring in the sidings and double track that have been provided. However, schedule finalization typically does not occur until well into the feasibility-level planning process. Finalized train schedules are typically not available at the time of a preliminary screening analysis. Also, it is important to understand the role of simulation in the overall process, given the very early stage of project develop- ment associated with a typical screening-level analysis. Advanc- ing the infrastructure design and pro forma schedules beyond the conceptual level requires more refined data. Although the SU modeling tools are potentially capable of more refined analysis given better data, this data is not typically available at the time of a preliminary screening. As a result, it is important to understand that a positive screening analysis does not prove that any specific track design or operating schedule will work. Rather, it indicates that further study may be warranted, which could lead to the acceptance of the proposal, or a variant of it, by the concerned stakeholders (e.g., the new passenger service proponent, the freight railroad and any involved government or regulatory authority). The reason is that any simulations performed in either Steps 1 or 4 are based on limited data, and they may fail to capture the full complexity of real-world operations. Due to the data limita- tion in the screening phase, feasibility metrics generated by the analysis cannot be considered sufficiently reliable for basing final decisions. Steps 1 and 4 are clearly optional and need be undertaken only if the user has sufficient confidence in the data to warrant the extra effort. Thus, the Step 4 screening analysis only validates the con- flict identifier’s suggestion of overall infrastructure quantities as reasonable under assumed conditions. For a screening- level analysis, the simulation is not essential. At that level, it functions only as a qualitative cross-check on the infrastruc- ture being recommended by the conflict identifier function- ality. That is, after adding the recommended infrastructure, a visual review of the string-line diagrams should show that capacity is sufficient to support the required rail operations without undue delay of trains. 3.5.2 Rules of Thumb for Laying Out Infrastructure The use of the simulator (Steps 1 and 4) supports the screening process as a demonstration that capacity may be sufficient. A simplified conflict identifier methodology pro- vides a structured analysis process that employs a level of data that is generally available to the public. Nonetheless, if it is desired to use the simulator in Step 4, the analyst is required to develop a specific infrastructure lay- out for evaluation in the simulation tool. Because the tool itself does not say exactly where the infrastructure should be added, it is left up to the analyst to determine this. That is where rules of thumb come in, because there is no single optimal design strategy that can be applied across the board. Rather, the design must be tailored to meet the operating requirements of the spe- cific service(s) being envisioned. If a line is being laid out to accommodate multiple shared-use services, the design often must reflect a compromise between the competing needs of the different kinds of service that will be operated. As such, a line that is intended predominately for passenger use may be laid out differently than one designed for freight or heavy mixed traffic. For example, fast passenger trains may need longer passing sidings but due to their higher speed, could tolerate a greater distance between sidings; slower freight and com- muter trains need shorter, more closely spaced sidings. In general, it is a good idea to space meet and pass infra- structure as uniformly as possible along the line rather than locating it based on any one particular train schedule. Spacing sidings evenly maximizes the capacity of the line and minimizes the design headways for passenger service while affording maxi- mum schedule and operational flexibility. It results in a robust infrastructure design per the FRA Guidance Manual (1). For laying out the track, the following is recommended: • The spacing and number of the sidings depend on the anticipated passenger service frequency, minimum peak- hour headway requirements, and forecasted freight traffic volumes. The number of sidings is suggested by the conflict identification analysis. • A good rule of thumb is to space the meet/pass locations as evenly as possible given the locations of existing double track and proposed stations.

38 • A determination of how long to make the sidings needs to be made as follows: – If trains are not expected to run precisely on time, then exact meet/pass locations cannot be precisely deter- mined in advance. For example, because the departure time variability of freight trains often exceeds the run- ning time between sidings, this probabilistic approach is often followed in laying out freight infrastructure (38). Expected delay times are minimized by spreading out the double-track mileage along the corridor, locating short passing sidings at frequent intervals. A good proto- type based on an existing passenger service is New Jersey Transit’s Atlantic City rail line or, for a proposed service, the SEHSR plan. The Atlantic City line (39) operates 14 round trips per day at up to 79 mph with diesel trains, on a single- tracked line. It has 4,500-foot-long passing sidings at approximately 10-mile spacing or about 10 percent double-track mileage. These sidings are long enough to support moving passenger train meets at a reduced speed of 10–15 mph. The proposed SEHSR corridor (40) has suggested sidings of 3.5–4.0 miles long, with 11 miles of single track between them or about 26 percent double track. Turnouts giving access to and from sidings would allow for 45 mph passenger speeds (40 mph for freight) and sidings would have intermediate signals, so they could function as short double-tracked sections. These sidings would be long enough to allow moving passenger train meets at a reduced speed of 25–30 mph, but not high- speed meets between passenger trains. – If however passenger trains are expected to run on time with only a few minutes of variance, then a good case can be made for building longer passing sidings or double- track sections to permit moving meets between passenger trains. Practical experience shows that these double-track sections must be a minimum of 10 miles long or include a station stop. A good prototype based on an existing ser- vice is the West of England Main Line, operated by South West Trains as Wessex Route 4. Wessex Route 4 (41) operates 14 round trips per day as an hourly clock face service from Exeter to London Waterloo station. The line is single-tracked for 25 miles from Salisbury to Templecombe; there is an 11-mile double-track section from Templecombe to Yeovil Junc- tion. From Yeovil Junction to Exeter there is a 46-mile single-track section with a short station siding in the middle at Axminster that facilitates half-hourly peak headways. Key assumptions in passenger service planning are that the passenger trains will run on time and that sufficient capacity mitigation will be provided to the freight railroads to make this possible. Thus, it can be seen that providing adequate capacity mitigation is in the interest of both the freight and passenger services. Therefore, the MWRRS (42) adopted a design standard of a 10-mile-long double-track section every 50 miles. For 110 mph operation, a 50-mile siding spacing is sufficient to support hourly clockwise schedule headways. Based on a schedule tolerance of a few minutes for each pas- senger train, a 10-mile length of double track is sufficient to allow for “running” train meets without any time loss to either passenger train. Passing sidings shorter than 10 miles are not long enough to permit full-speed moving meets and they may not benefit from installation of high-speed turnouts at each end. As a result, each passenger train meet loses 3–10 minutes on the timetable if the sidings are not long enough. Building fewer, longer sidings also reduces the cost of signal and control infrastructure. This design is also good for freight trains because it allows the long freight trains to clear the main track quickly at 30–45 mph, rather than having to slow down to pull into a short siding. This reduces the probability that a passenger train will be delayed by a freight train ahead by reducing freight train clear- ance times, which can allow tighter headways. This design rule of thumb was used in developing the proposed infrastruc- ture layout for the St. Louis to Kansas City corridor and was also suggested for reconfiguring the freight sidings between Truesdell and Milwaukee, by providing a single, long siding rather than three short freight passing sidings. 3.5.3 Methodological Approach to Conflict Identification The conflict identifier implements an enhanced version of the Ideal Day. The approach consists of a simple review of potential conflicts and locations where trains would pass each other if adequate infrastructure were available. By counting the number of identified conflicts (other than within exist- ing sidings or double track) an estimate can be made of the required number of additional passing locations that need to be added to a corridor. Although previously applied to single-tracked low-density lines, the SU tool has been used to develop multiple-tracked high-density applications as well. In the SU system, the conflict identifier tool helps develop infrastructure plans whereas the simulator is used to evalu- ate infrastructure plans to ensure that the results satisfy design criteria. As such, the two approaches complement rather than compete with one another. As shown in Fig- ure 3-1, both SU methodologies are used together in a four- step process. • The simulator is used in Steps 1 and 4, and • The conflict identifier is primarily used in Steps 2 and 3.

39 As a result, it should be clear that the conflict identifier approach has been developed into an evolved methodology for suggesting the level of capacity that needs to be added to a shared-use corridor. The range of application has been extended well beyond the light-density, single-tracked lines to which Ideal Day methodology was originally applied. The three case studies demonstrate successful application of the tool to some of the densest and most complex rail corridors in the United States. The SU conflict identifier is built on the base of the SU simu- lator. The conflict identifier uses SU simulator logic, with train capacity constraints disabled. The central dispatcher routes the trains through the rail network (along preferred routes) as if each train were the only one operating on the rail system. It is essential that routing preferences be set up correctly so they do not send all of the trains down the same track rather than using existing parallel tracks. The “Nodes” table is programmatically generated but it can be edited manually to modify these track routing preferences, if necessary. Although not subject to delays from any other trains, trains are still subject to all the grades, curves, and speed limits associated with each link. The SU simu- lator uses a built-in Train Performance calculator to calculate the time, speed, and position of each train along its route. The SU conflict identifier methodology is largely based on, but not identical to, the earlier 2004 Ideal Day methodology, but the SU conflict identifier uses more restrictive logic. In the SU conflict identifier, if trains get within 500 feet of one another on the same track, the conflict identifier will flag a conflict. For each conflict, the SU conflict identifier then uses a proximity parameter (that can be modified by the user, with a default of 2 miles) to determine whether to color the ball red or green as follows: • Any conflict occurring within the conflict threshold (e.g., 2 miles) of a passing siding or crossover switch will be colored green. • Otherwise, if the distance to the nearest meet/pass infra- structure exceeds the conflict threshold, then the ball is colored red. • However, the Ideal Day methodology does not include a proximity parameter. For either of these cases it would generate a red ball. • If trains’ preferred routes cause them to meet or pass on different tracks, then the SU conflict identifier will not identify any conflict, and no balls will be generated. In this situation, the Ideal Day methodology would have generated a green ball. As a result, the SU methodology for coloring balls does not guarantee the availability of nearby meet/pass infrastructure, but only indicates the proximity of such infrastructure. A possible methodological enhancement would be to scan parallel tracks to see whether they are actually being used. If the parallel infrastructure were found to be conflicted, then some of the green balls may actually be determined to be red balls. As a result, treating all of the balls identified by the SU conflict identifier as if they were red balls (regardless of how they are colored) gives the most conservative treatment, and is the recommended approach. 3.5.4 Approach to Model Validation The primary purpose of the SU screening tool is to estimate the level of infrastructure that would need to be added to a rail corridor to support a state DOT decision on whether to continue with a proposed passenger rail project. Methodologi- cally, this level of infrastructure need is estimated directly by the conflict identifier, without recourse to train delay statistics or any other surrogate measures of capacity. Hence, the validation approach here is based on results— to what degree do the conflict identifier recommendations either agree or disagree with the overall capacity plans that were developed by earlier, much more detailed, simulation studies? As a result, the capacity recommendation of the conflict identi- fier was directly compared with the level of infrastructure that was recommended by the earlier detailed simulation studies. This was done for two of the three case studies: St. Louis to Kansas City and Chicago to Milwaukee, for which detailed simulation benchmarks and capacity plans were available from the 2004 MWRRS work. For the St. Louis to Kansas City and Chicago to Milwaukee case studies, additional, more recent simulation benchmarks were also available—but these studies focused on much smaller, incremental changes to the corridor track layouts that were assessed by an extremely detailed RTC-style simulation. These studies recommended changes, like adding crossovers, based on an analysis of localized constraints that require detailed railroad operating data to adequately assess. As a result, the broader-scoped 2004 proposals for adding larger numbers of passenger trains to corridors were actually more appropriate applications of the tool and were used as the basis of the scenarios and validations performed here. The results show that the SU screening approach performs very well for this type of assessment. 3.6 Case Study Analyses Results This section summarizes the results of the three case studies undertaken. 3.6.1 Case Study 1: St. Louis to Kansas City The 2004 MWRRS simulation defines the base line against which the results of the SU tool have been validated. The

40 infrastructure and train databases, therefore, closely follow the structure of the earlier assessment, in order to develop a consistent comparison. • For the infrastructure database, the data files that were used as the basis of the original St. Louis to Kansas City corridor assessment were reformatted as required by the SU tool. The base case infrastructure was upgraded to include the recently double-tracked Gasconade River Bridge and the California siding extension. • For the traffic database, freight and passenger trains reflect the current operating pattern (eastbound loads via the river, empties returned via the Sedalia Line) with 2 Amtrak trains and 19 freight trains in each direction. A single daily freight train pair terminates at the Labadie Power plant with the balance continuing east to St. Louis. In addition, two pairs of freight trains operate each day between Kansas City and the MNA connection at Pleasant Hill. This is con- sistent with the train counts extracted from the FRA grade crossing database. The scenarios to be assessed here derive from the 2004 study. These scenarios develop the infrastructure needed to introduce an all-day corridor service—six daily round trips using tilting high-speed trains—to replace Amtrak’s current two conventional round trips. As a result of this more aggressive scenario, the infrastructure needs are much greater than those that were found by Missouri’s 2007 assessment, which developed only incremental upgrades aimed at short-term improvements. The 2004 plan and this case study do not contradict the results of the 2007 assessment. It is just that the corridor investment needs are much greater for the significant upgrade that was envisioned by the 2004 plan, as compared to simply making incremental upgrades to the exist- ing Amtrak service. At Union Pacific’s request, the 2004 assess- ment used RTC to perform the simulation. However, due to the high volume of forecast freight traffic, the 2004 assessment reported that the RTC model could not handle the forecasted 2020 traffic on current infrastructure. This is based on the MWRRS Project Notebook (page 6-87): Union Pacific also requested that a freight-only base case be developed. This request was also accommodated. If freight traffic doubles without adding infrastructure, the performance of the system by 2020 will be very weak. Without investment, it will not even be possible to continue operating Amtrak trains on any acceptable schedule. The RTC simulation locked up when a 2020 do nothing simulation was attempted, keeping the Amtrak trains on the tracks. Accordingly, the Amtrak trains were removed from the simulation and a 2020 do nothing scenario was devel- oped without Amtrak trains, which allowed the RTC simulation to run successfully. . . . Even with new infrastructure added, the RTC model took 4 days to complete one 30-day simulation at 2020 volumes. The size and complexity of this analysis creates a challenge for the timely completion of computer simulation runs. At 2020 traffic volumes, the simulation performs adequately only if the full packages of proposed infrastructure investments are included. With any fewer investments, the simulation bogs down and often terminates short of completion. This reflects the physi- cal reality of conducting complex, high-volume rail operations. However, to obtain comparative delay statistics, there is often still a desire to obtain a completed simulation of a hypothetical “do nothing” alternative. Because of this difficulty in getting the RTC model to run with less than full infrastructure at 2020 traffic levels, scenario development was performed with MWRRS pas- senger trains at current 2002 freight traffic levels. As a result, 2002 traffic volumes were used to develop the mitigation analysis in the 2004 study. Based on the FRA grade crossing data (the most current publicly available source of train traffic data), it can be seen that 2012 train volumes have not changed very much from the 2002 base line volumes that the 2004 assessment used. This calls into question the earlier 2004 plan assumption that freight traffic will double over 20 years, because the data suggests that over the past 10 years, freight traffic on this corridor has been essentially flat. How- ever, revising the future growth forecast is beyond the scope of the current effort. To be clear, to accommodate a forecasted doubling of freight traffic by 2020, the 2004 assessment sug- gested that fully triple tracking the Jefferson City line may ultimately prove necessary. Following the MWRRS Project Notebook (page 6-91): The 2002 base case generates 11 days of freight train delay; by 2020, without double-tracking the Osage and Gasconade River Bridges, this would rise to 121 days in the do nothing scenario even if Amtrak trains were discontinued. Freight delays grow by a factor of 12 when volume less than doubles. This dispropor- tionate increase in train delays clearly shows that the system will be reaching its capacity limit by 2020. If Union Pacific proceeds with double-tracking the two river bridges, then additional triple tracking between Jefferson City and St. Louis (beyond what is included in the current infrastructure plan for the MWRRS) will be needed to reduce 2020 freight delays below the level that would have occurred, if MWRRS did not exist. Development of such a strategy will require an engineering field assessment to determine the areas where triple-tracking may be feasible, along with additional simulation modeling effort to ensure the delay mitigation criteria for the MWRRS are fully satisfied. A likely scenario is full triple tracking except for the tunnels at Gray’s Summit and the Osage and Gasconade River bridges, which may remain only double tracked. It is anticipated this expanded modeling effort will be funded in a future project phase.” Therefore, it can be seen that the 2004 infrastructure plan, which was based on 2002 freight traffic volumes, is still an appropriate benchmark to use for validation purposes. This case study develops an infrastructure plan for adding six passenger round trips at today’s freight traffic levels. This will develop an infrastructure recommendation that is most consistent with the 2004 validation benchmark. The infrastructure has been

41 updated to reflect some improvements that have occurred since 2004 (e.g., the Gasconade River bridge) but does not include the Osage River Bridge that, although funded, has not been completed as of the time of this report. The Osage River Bridge’s expected completion is in 2013. The conflict identifier identifies capacity requirements for both freight and passenger needs as follows: • Step 2, defined as the “do minimum” case, defines the infra- structure needs for adding passenger trains alone to the corridor. This consists of the infrastructure improvements that are needed for passenger train operations. They include such things as track condition upgrades, stations and plat- forms, signal system improvements, and meet/pass infra- structure that are needed for passenger operations. These improvements would have to be made regardless of the level of freight traffic. • Step 3, defined as the “prepare build” case, defines the additional infrastructure needs for maintaining freight in addition to passenger train service on the corridor. – Typically this consists of additional passing sidings and double-track sections needed to provide enough capacity for joint operations of both freight and pas- senger trains. – In addition to mainline track sections (passing sidings and double track), there is often a need to address local train and yard needs. For example, short sidings or pocket tracks can be built clear of the main line to enable local switchers to “lock themselves in” to industrial sidings so they can serve local industries without fouling the main line. The provision of yard lead tracks can enable yard switching to take place without interfering with mainline operations. – However, the SU methodology, because it focuses pri- marily on main-line operations, is well suited to assist in identifying the first area of need (sidings and additional main-line track). The tool is not well suited to analysis of industrial switching or yard operations and will not assess the needs for adding such track. Two conflict identifier runs, as shown in Figures 3-2 and 3-3, are needed to address both steps of the process. • The results of the Step 2 “do minimum” or passenger-only run are shown in Figure 3-2. This replaces the current two Amtrak round trips with the six planned MWRRS passenger round trips. The conflict identifier runs assess the capacity infrastructure need for passenger trains only. – This analysis shows no need to add passenger train meet- ing points east of Jefferson City, because the existing rail line is already double-tracked. Note that there are no passenger train conflicts east of Jefferson City. Note: Mi. 0 = St. Louis Mi. 122.5 = Jefferson City Mi. 281 = Kansas City Figure 3-2. St. Louis to Kansas City—”do minimum” conflict identification.

42 – However on the single-tracked Sedalia Subdivision west of Jefferson City, there are a total of nine passenger-on- passenger train meets. Because each passenger train meet affects two different passenger trains, this count is multiplied by two, so 18 meets divided by the 12 daily passenger trains yields an average of 1.5 meets per train. Rounding 1.5 up to 2, and assuming the passenger train schedules could be adjusted a little bit, this indicates a need to build two 10-mile passing sidings for passenger meets between Jefferson City and Kansas City. This is what would be needed if only passenger trains used the line and all freight trains were diverted to the parallel river subdivision west of Jefferson City. • The results of the Step 3 “prepare build” (freight plus pas- senger run) are shown in Figure 3-3. This adds freight trains along with the six planned MWRRS passenger round trips, generating many additional conflicts. There are 41 total conflicts on the single-tracked Sedalia Line west of Jefferson City, and 20 conflicts in the double-tracked terri- tory east of Jefferson City. However, because 9 of the con- flicts on the Sedalia Line are between passenger trains—and counting each passenger-passenger conflict twice—there are 50 total conflicts on the single-tracked Sedalia Line west of Jefferson City, and 20 conflicts in the double-tracked territory east of Jefferson City. – This is 50/12 = 4.2 interactions per passenger train on the Sedalia Line, implying the need to add four passing sidings between Jefferson City and Kansas City. – On the existing double-tracked line there are 20/12 = 1.7 interactions per passenger train, implying the need to add two passing sidings between St. Louis and Jefferson City. Figure 3-4 provides a summary of the SU analysis. Finding: The conflict identifier identified the same required infrastructure as did a more detailed analysis. This demon- strates the tool’s ability to perform as intended on a heavily used, shared freight corridor with difficult terrain and challenging operational constraints. 3.6.2 Case Study 2: Northeast Corridor (NEC) Baltimore to Wilmington This case study is the second of three case studies that demonstrates the capabilities of the SU Web-based tool for prefeasibility screening analysis. The corridor under study is the Northeast Corridor (NEC) between Baltimore and Wilmington. The corridor is a mix of double-, triple-, and quadruple-tracked rail. It is densely traf- ficked with commuter and intercity passenger service and with freight trains operating between midnight and 6 A.M. Figure 3-3. St. Louis to Kansas City—“prepare build” conflict identification. Note: Mi. 0 = St. Louis Mi. 122.5 = Jefferson City Mi. 281 = Kansas City

43 Figure 3-4. Summary of St. Louis to Kansas City SU analysis.

44 on weekdays. There are, on average, 110 passenger trains and 20 freight trains operating on the territory on a typical weekday. The case study considers one of several alternative plans that have been proposed for the corridor in the future. The plan envisages developing a new high-speed rail alignment along the NEC that will enable the elimination of Amtrak Acela Express trains from the existing rail corridor, thus freeing capacity for 24-hour freight movements (and, possibly, additional passenger services). The analysis includes only the existing corridor and not a proposed new alignment for high-speed rail. The case study follows the SU methodology, running simu- lations to establish operational feasibility metrics for baseline operations. The study then uses the conflict identification capability of SU to determine needs for adding infrastructure. The analysis determines that conflicts, given the current sched- ule and infrastructure, are minimal. The analysis of a future scenario proceeds while assuming no major infrastructure investments in the corridor. The subsequent step develops a future traffic scenario that removes all 30 daily Acela Express trains from the baseline and adds to the schedule 16 new freight trains over the 24-hour day. The analysis assesses the feasibility of restoring freight ser- vice to the existing NEC tracks if Acela Express were relocated to an entirely new high-speed infrastructure. A simulation of the future traffic scenario on the corridor and the operational metrics indicate no degradation of service for either freight or passenger traffic compared with the baseline. Six additional passenger trains are added to the schedule in order to analyze the sensitivity of the findings. A comparison of the results with the future scenario provides an indication that the feasibility of the future case scenario is robust. The NEC from Baltimore to Wilmington was proposed as a “wild card” option because of its unique characteristics as the premier shared-use corridor in the United States. Today, freight operators on the NEC face onerous operating restric- tions. Freight operations are severely restricted on the corridor during the day (18 hours) and generally limited to one track during the narrow 6-hour nighttime window. Many of these restrictions were imposed after the Chase, Maryland, accident with a Conrail freight locomotive (43) and have succeeded in displacing most freight operations from the NEC, except from Baltimore to Wilmington, where the Norfolk Southern has no practical alternative. In addition, the Maryland Department of Transportation would like to expand MARC commuter rail service over this same segment north from Baltimore to Newark, Delaware— linking to an expanded SEPTA commuter rail service at Newark. Taking expanded commuter rail and freight needs into account, the Mid-Atlantic Rail Operations (MAROps) Study (44) and Amtrak’s Northeast Corridor Master Plan (45) have each proposed significant infrastructure additions for expanding NEC capacity from Baltimore to Wilmington as follows: • A key goal of MAROps capacity expansion has been to provide a single, dedicated freight track, to allow all-day freight operations along the corridor, completely separate from Amtrak operations. However, this plan would not provide for MARC commuter rail needs. • However, Maryland Department of Transportation’s proposal, the “MARC Capacity Plan” (46) would add two tracks for shared-use by freight and commuter trains— but not the dedicated freight track that has been proposed by MAROps. Maryland DOT has proposed, for example, a four-track Gunpowder River Bridge by 2020. The “MARC Capacity Plan” is based on a shared-use assumption. As a result, Maryland’s proposal is a bit different than that of Amtrak and MAROps, and somewhat more costly, but it has the advantage of supporting commuter rail as well as freight needs for this segment of the corridor. Development of this option (shared use with MARC commuter trains) may be worthwhile to the freight railroads, because it brings along the possibility of an additional funding source for developing the needed capac- ity expansion as opposed to dedicated tracks, which would need to be justified based on the freight benefit alone. However, the cost-benefit analysis that was developed for MAROps did not reflect any freight market share increase that would result from construction of the dedicated track. While MAROps clearly under estimates the level of benefit that would result from restor- ing full-time Norfolk Southern freight rail access to the Ports of Baltimore and Wilmington, it may be more beneficial overall if part of the costs for developing the proposed NEC capacity enhancement could be shared by a commuter rail system. The section of the Baltimore to Wilmington corridor that is shared with heavy freight operation runs along a segment of the NEC stretching 63 miles from Baltimore Bayview Yard to Shellpot Junction located just south of Wilmington, Dela- ware. Amtrak has sole ownership of this section of the NEC and handles all dispatching along this portion of the corridor. The Baltimore to Wilmington section of the NEC qualifies as a case study for SU because it is the only section of the NEC that still has heavy freight running on it. Passenger services along the study corridor from Baltimore to Wilmington are provided by Amtrak, SEPTA, and MARC. The following Amtrak services run the corridor: • The Northeast Regional, which runs between Newport News and Boston; • The Acela Express, which runs between Washington and Boston; • The Carolinian, which runs between Charlotte and New York;

45 • The Crescent, which runs from New York to New Orleans; and • The Silver Service, which runs from New York to Miami. MARC and SEPTA provide local commuter rail services with MARC’s Penn Line operating between Baltimore and Perryville, and SEPTA operating between Wilmington and Newark. At present, no local commuter service connects Perryville and Newark. Currently, NS handles most of the freight operations along the Baltimore to Wilmington segment of the NEC. CSX uses a separate parallel route, which is not part of this study; CP has freight trackage rights, currently inactive. Most of the freight traffic originates from Baltimore, the Delmarva Peninsula, and Wilmington, eventually converging onto the NS Port Road rail line at Perryville where it then follows the Susquehanna River to Harrisburg. There is currently no through north-south freight traffic from Baltimore to Wilmington. Several competing plans to renew and improve the NEC corridor segment from Baltimore to Wilmington have been proposed. Both Amtrak and MAROps (Mid-Atlantic Rail Operations) (47) have proposed plans that would allow freight and high-speed rail lines to have their own dedicated tracks within the corridor. The Maryland Department of Transpor- tation, who operates the MARC commuter rail service, has proposed a plan that would allow a dedicated passenger high- speed rail line in the corridor and a regional passenger rail and freight connection from Baltimore to Newark to Wilmington. The NEC Baltimore to Wilmington corridor begins at Balti- more’s Penn Station. Passing Bayview Yard it travels northeast to the MARC station stop at Martin Airport, where about half the Penn Line trains end. Continuing north, the corridor then reaches the Gunpowder River Bridge. This is the first of three bridges (Gunpowder, Bush, and Susquehanna Rivers) that are limited to double track and that are nearing the end of their life expectancies. Just beyond the Edgewood MARC station, the route crosses the Bush River and travels through a military restricted area near the Aberdeen Proving Grounds and then on to the next stop at the Aberdeen Amtrak station. Continu- ing north, the route crosses the Susquehanna River Bridge to the Perryville MARC station. This station marks the current end of the Penn Line. The NS Port Road Line also joins at Per- ryville and is where freight joins or leaves the corridor to/from Harrisburg. Continuing north, the corridor segment from Principio (just northeast of Perryville) to the town of Bacon (near North East, Maryland) is double tracked. The proposed Chesapeake Connector Project (48) would increase this segment to triple track. However, the Maryland DOT has proposed quadruple track for this segment in order to add enough capacity for commuter trains, as well as freight. At Elkton, Maryland, MARC is proposing to build a new station for an extension to the Penn Line that would continue to Newark, Delaware, where it could join up with SEPTA’s regional rail line. Beyond the Newark Amtrak station and freight yard, the Delmarva junction allows freight to leave/enter the corridor. Between Newark and Newport, Delaware, there is a SEPTA commuter rail stop located at Churchman’s Crossing. Shellpot Junction, located just southwest of Wilmington, marks the end of the study corridor and is where the NS freight line to Edge- moor Yard diverges from the Amtrak-owned Northeast Cor- ridor. Finally, the corridor reaches the Wilmington, Delaware, Amtrak station that is the northern end point for this analysis. This section presents the current plans for development of the corridor. For purposes of demonstrating the SU tool, the analysis focuses on the last plan described: the high-speed rail plan. (Note: The use of this plan in the case study for pur- poses of exposition and demonstration in no way indicates the authors’ views with regard to such a plan’s merits or the likelihood of it being adopted or funded.) Amtrak, MARC, and SEPTA all expect greater ridership over the next 20 to 30 years, but potential growth is constrained by the currently existing rail infrastructure (49). Various plans such as the MAROps Phase 2 Study (which draws on the Northeast Corridor Infrastructure Master Plan) (50) and a competing MARC Growth and Investment Plan (51) have been proposed to increase rail capacity in the Baltimore to Wilmington segment of the NEC. Amtrak and MAROps Plans Both Amtrak (52) and MAROps propose expanding to triple track the entire corridor from Baltimore to Wilmington, two tracks for high-speed Amtrak use and one for freight use. This would heavily restrict the potential for local commuter rail expansion along the route. The Amtrak plan is more intercity- passenger oriented, allowing 15 additional round trips and improving trip times between Washington and Philadelphia (53); while the MAROps plan is oriented more toward freight. Amtrak’s plan does not fully take into account MARC’s pro- posed plan to extend the Penn Line to Newark, Delaware. However, they both agree on the following key investments: • Increasing the mainline track from Wilmington to Baltimore to at least triple track, thus allowing a dedicated freight track for NS. • Replacing the Gunpowder, Susquehanna, and Bush River bridges, thus allowing the route to be increased from double to triple track. MARC/Maryland DOT Proposal MARC, along with the Maryland Department of Transpor- tation, proposes expanding the entire Baltimore to Wilmington

46 route to quadruple track; thus allowing double track for high- speed Amtrak use and two tracks for shared use between local commuter and freight trains, as shown in Figure 3-5. By upgrading the Baltimore to Newark segment to quadruple track and connecting to existing quadruple track north of Newark, Amtrak would be able to expand its operations to the level desired in its proposed plan. In addition, MARC/ SEPTA would be able to offer a local Baltimore to Wilmington route that would allow passengers to change trains at Newark. However, the MARC Penn Line would still have to share track with NS freight traffic. Like the Amtrak and MAROps plans described above, the Gunpowder, Susquehanna, and Bush River rail bridges would have to be replaced, but with quadruple track instead of triple track. SEPTA Plan SEPTA plans to increase the number of commuter trains running between Wilmington and Newark, Delaware, on the Wilmington/Newark Service Line service by four round trips (54). Because there are far fewer infrastructure problems north of Newark, SEPTA would only need to reconfigure the Newark station facility and would not need to invest in new infrastructure (such as adding new tracks or bridges, etc.). High-Speed Rail Plans Amtrak (55) and others (56) have been developing plans for implementing true high-speed (e.g., 220 mph) rail service in the NEC. It is known, however, that the current NEC track alignment has too many curves and is not able to support the requirements of true high-speed rail. In some places, curve easements may be possible; in other places the alignment is likely to be too difficult to adjust, so entirely new green field alignments will need to be developed for attaining the service objectives. When this occurs, a possible outcome would be replacement of the existing Acela Express service with a new-generation high-speed train. At that point, the capacity of the existing tracks could be redeployed to support more conventional intercity, commuter, and freight services, similar to developments that have occurred in Europe when new high-speed lines were opened. Although in the past 20 years freight traffic has declined in the NEC, freight services could be revitalized in the future. Clearly, there are many unknowns associated with the adop- tion of a plan, the process of approvals, and the actual devel- opment of a new green field rail alignment—and subsequent developments on the existing corridor. Validation There have been numerous NEC detailed capacity simu- lations performed for Amtrak and FRA using a variety of tools, including the TAD LogSim model (57) (which Amtrak was known to be using for internal planning purposes) and SYSTRA’s RailSim tool (58). Although these benchmarks are not publicly available, they could possibly support validation if they were made available. Key Assumptions of the Analysis Since there are multiple plans for the evolution of the corridor, this study focused on one of these plans and built the case study analysis around it. The plan of focus is the one for high-speed rail, which will result in the removal of the Acela Express trains from the existing NEC alignment, to be replaced by high-speed trains on a new alignment. This would result in an increase in capacity on the existing infrastructure that would permit adding freight traffic over a 24-hour period to the NEC between Baltimore and Wilmington. The analysis assumes a future case with no new additional infrastructure, but with modifications to the mix of traffic: 30 daily Acela Express trains will be removed from the corridor, and 16 freight trains will be added: 4 in each direction between Perryville and Delmarva Junction (i.e., Newark) and 4 in each direction between Perryville and Bayview Yard (i.e., Baltimore). The SU methodology is designed to identify the infrastruc- ture need for adding new passenger trains to existing freight or shared-use corridors. However, this case study is atypical because it assesses the prospects for adding freight trains to an existing passenger corridor, where some of the passenger trains are being removed and replaced with trains on a new alignment. • Step 1 is the “do nothing” baseline. • Step 2, defined as the “do minimum” case, identifies con- flicts (i.e., areas lacking infrastructure for meets or over- takes when running a modified schedule that includes new services). Because the future case traffic includes a differ- ent mix of passenger and freight, the conflict identification Figure 3-5. Maryland DOT 2020 Plan for NEC Baltimore-Wilmington infrastructure.

47 will determine the suitability of existing infrastructure to accommodate existing traffic, which by assumption also should accommodate the alternative future traffic contain- ing a different mix of freight (+16) and passenger (-30) trains. The results of this analysis are shown in Figures 3-6 through 3-8. • Step 3, defined as the “prepare build” case, defines the infra- structure needed for adding freight in addition to passenger trains on the NEC. If the analysis finds that infrastructure is sufficient in the baseline, then the analysis assumes that the future case scenario also can be accommodated (if this is not the case, then feasibility metrics for simulations of the Figure 3-6. Baltimore to Wilmington—conflict identification, 12 a.m.–8 a.m. Figure 3-7. Baltimore to Wilmington—conflict identification, 8 a.m.–4 p.m.

48 future case—Step 4—will indicate degraded service, e.g., increased delay). The results of this analysis are shown in Figures 3-9 through 3-11. For the “do minimum” case, the conflict identifier found only a single red ball (at 7:15 P.M. near mile 22). That red ball and the clusters of green balls in Figure 3-6 correspond to trains that track each other closely (i.e., run parallel to one another and would probably be dispatched on separate tracks in the real-world operating setting). The research team concluded that the current infrastruc- ture is generally adequate to support current levels of traffic with on-time performance, while noting that track closures for maintenance or unforeseen mechanical failures could result in significant delays. The research team also added the caveat that further study is required to determine that under normal operations and “ideal” conditions (i.e., no inclement weather, no mechanical failures, and no periodic maintenance) that all scheduled trains can be dispatched in the corridor with delay below an acceptable threshold. Such additional analysis can be conducted with SU. The final step in the process is to develop a hypothetical future (“build”) case for simulation evaluation. The research team’s analysis assumes a future case with no new additional infrastructure, but with modifications to the mix of traffic: 30 daily Acela Express trains will be removed from the corridor, and 16 freight trains will be added: 4 in each direction between Perryville and Delmarva Junction (i.e., Newark) and 4 in each direction between Perryville and Bayview Yard (i.e., Baltimore). This scenario assesses the ability to restore freight service to the existing NEC tracks if Acela Express were relocated to an entirely new, high-speed infrastructure. As compared to the base case simulation, Table 3-6 shows that average delay for passenger trains is practically unchanged. Average delay for freight trains increased from 54 to 73 minutes per train. However, when considering that freight throughput in the corridor increased by 80 percent (from 20 to 36 trains per day) the growth in average delay may be a worthwhile trade-off. Finding: This case study was undertaken as a “double-blind” exercise without a validation benchmark. Regarding the “do minimum” case, the conflict identifier showed that the existing operation can be handled over the existing infrastructure with minimal conflicts. Results indicate the merit of additional study. Regarding the “future build” scenario, the results of both the conflict identification and simulation screening concur that “full” Norfolk Southern freight service (daytime as well as nighttime) could be restored along this section of the NEC if the high-speed Acela Express service were shifted away from the existing tracks onto a new parallel high-speed alignment. This suggests the potential for a substantial freight benefit associated with the implementation of true high-speed service between Baltimore and Wilmington. Additional study could Figure 3-8. Baltimore to Wilmington—conflict identification, 4 p.m.–12 a.m.

49 Figure 3-9. Baltimore to Wilmington—future case string line, 12 a.m.–8 a.m. Figure 3-10. Baltimore to Wilmington—future case string line, 8 a.m.–4 p.m.

50 explore this potential. A summary of this analysis is shown in Figure 3-12. 3.6.3 Case Study 3: Chicago to Milwaukee The Chicago to Milwaukee rail corridor handles significant volumes of commuter, freight, and intercity rail passenger traffic. Metra commuter rail service (59) operates on the south end of the corridor, while Amtrak’s Hiawatha service (60), with its heavily commuter-oriented ridership, operates the full length of the corridor. In addition, the Canadian Pacific Railroad uses this line as its main access into Chicago so the corridor features a complex mixture of intercity, commuter, and freight trains in multiple-track territory. Against this backdrop of existing shared-use operation, regional plans have sought to add a high-speed intercity passenger rail component into the traffic mix. Wisconsin pro- posed extending the corridor to Madison, Wisconsin, which would have added more ridership to the Chicago-Milwaukee segment of the corridor; currently, environmental studies are underway for extending rail service all the way to the Twin Cities. Any service extension north of Milwaukee would need more capacity on the Chicago to Milwaukee segment, but adding more passenger trains to this segment would impact all existing freight and commuter rail services. This case study employs the SU Web-based tool to gain a better understanding of issues pertaining to increased pas- senger train speeds and frequency on the Chicago to Milwaukee segment. The analysis also supports plans for improved service on the existing Hiawatha corridor, and it lays the groundwork for addressing issues relating to future extensions to Madison, Green Bay, and the Twin Cities. Figure 3-11. Baltimore to Wilmington—future case string line, 4 p.m.–12 a.m. Table 3-6. Baltimore to Wilmington—future case summary delay statistics.

51 Rail operations along the Milwaukee to Chicago study corridor are shared among commuter, intercity passenger, and freight services. For a short distance between Chicago Union Station and Lake Street, Amtrak controls the line while Metra dispatchers operate the line from Lake Street to Western Ave- nue. From Western Avenue all the way to Milwaukee, Canadian Pacific Railroad (CP) handles all freight and passenger train dispatching.61 For most of the study corridor, CTC (centralized train con- trol) signaling is used with the exception of ABS (automatic block signaling) used for some track segments located within the city centers of Chicago and Milwaukee (62). Top passenger Note: String line charts in Steps 1 and 4 are for 8 A.M.–4 P.M. on day of analysis. Steps 2 and 3 show conflict identifier charts for 12 A.M.–4 P.M. Figure 3-12. Summary of SU analysis, NEC.

52 timetable speeds along the corridor range from 70 to 79 mph according to the data in the FRA National Grade Crossing Inventory. Currently, the study corridor handles a significant volume of commuter, freight, and intercity rail passenger traffic. The daily intercity passenger train volume north of Rondout is 8 round trips or 16 trains per day from Monday to Saturday and 14 trains on Sunday. South of Rondout, the volume of daily commuter and intercity passenger rail trips ranges from approximately 176 trips between Chicago and Pacific Junction to 76 trips from Pacific Junction to Rondout. The FRA National Grade Crossing Inventory shows 18 freight trains per day on the route from Techny to Milwaukee, however, this does not agree with the freight train volumes that have been used in recent simulation studies. This is discussed in more detail in the following sections. Amtrak Passenger Service Amtrak’s Hiawatha service runs the full length of the cor- ridor from Chicago to Milwaukee, operating seven daily round trips between Monday and Saturday (only six on Sun- day). The Empire Builder, which operates 1 daily trip from Chicago to Portland-Seattle, runs a portion of its route along the corridor making stops at Chicago, Glenview, and Mil- waukee before continuing westward. This brings the week- day passenger trip total to 8 round trips or 16 daily one-way trips. The schedule for Amtrak’s Hiawatha service is shown in Table 3-7. The 2004 MWRRS plans would replace these 7 round trips with 17 daily round trips for extending service to Madison, the Twin Cities, and Green Bay. Amtrak’s long-distance Empire Builder service is assumed to continue, which would bring the weekday intercity passenger train total to 18 trains in each direction, or 36 trains total. Metra Commuter Rail Service Metra commuter rail service operates on the south end of the corridor from Chicago to Rondout. According to the current schedule, the Metra MD-N service makes 30 daily weekday round trips between Chicago Union Station and Rondout (63). (Six of these trips end at Deerfield. It is unknown if these trips continue on as return trips or as deadhead trips or empty trains.) On weekends, 10 to 12 daily round trips run between Chicago Union Station and Rondout. Additional Metra trains from the NC-S and MD-W lines also share the corridor from Chicago Union Station to Pacific Junction. Freight Operations As noted earlier, CP handles the freight operations along the Chicago to Milwaukee corridor. CP uses this corridor as its main route bringing freight into and out of Chicago. A few CP road trains and locals (64) operate between Pacific Junc- tion and Techny; data from the FRA National Grade Cross- ing Inventory suggest that up to four freight trains operate per day over this short stretch of track. The research team Station Chicago to Milwaukee (Northbound) Train # 329 331 333 335 337 339 341 Chicago Union Station, IL 6:00 AM 8:25 AM 10:20 AM 1:05 PM 3:15 PM 5:08 PM 8:05 PM Glenview, IL 6:22 AM 8:47 AM 10:42 AM 1:27 PM 3:37 PM 5:32 PM 8:27 PM Sturtevant, WI 7:00 AM 9:25 AM 11:20 AM 2:05 PM 4:15 PM 6:14 PM 9:05 PM Milwaukee Airport 7:14 AM 9:39 AM 11:34 AM 2:19 PM 4:29 PM 6:28 PM 9:19 PM Milwaukee, WI 7:29 AM 9:54 AM 11:49 AM 2:34 PM 4:44 PM 6:45 PM 9:34 PM Station Milwaukee to Chicago (Southbound) Train # 330 332 334 336 338 340 342 Milwaukee, WI 6:15 AM 8:00 AM 11:00 AM 1:00 PM 3:00 PM 5:45 PM 7:35 PM Milwaukee Airport 6:26 AM 8:10 AM 11:10 AM 1:10 PM 3:10 PM 5:55 PM 7:45 PM Sturtevant, WI 6:43 AM 8:23 AM 11:23 AM 1:23 PM 3:23 PM 6:08 PM 7:58 PM Glenview, IL 7:25 AM 9:01 AM 12:01 PM 2:01 PM 4:01 PM 6:46 PM 8:36 PM Chicago Union Station, IL 7:57 AM 9:29 AM 12:29 PM 2:29 PM 4:29 PM 7:14 PM 9:04 PM Table 3-7. Amtrak Hiawatha service (Monday through Saturday) (66).

53 assumed they are mostly short locals serving industrial cus- tomers along the line. North of Techny to Milwaukee, the FRA National Grade Crossing Inventory reports 18 daily freight trains, or 9 trains in each direction. A recent 2010 HNTB capacity analysis (65) used 25 trains per day in 2010, increasing to 37 trains per day in 2030. Summarizing, both previous benchmark studies agreed that the future freight train volumes (including locals) should be 37 to 42 trains and that this will be attained in the 2020–2030 timeframe. Notwithstanding possible concerns regarding the validity of this forecast, for direct comparability to the previ- ous validation benchmarks, a freight train volume of 18 daily through trains each way (36 total trains per day) was used in the development of this case study. (The two previous benchmarks were based on forecast freight train volumes of 37 to 42 trains per day, including locals. Excluding locals, the projected through train counts were in the range of 33 to 38 trains per day.) Note that these forecasts fully double the train counts that the FRA National Grade Crossing Inventory shows for the line today. It is not clear whether the data in the FRA database underreport the actual freight train volumes or CP instructed the simulation study teams to use traffic volumes that are more representative of peak rather than average days. This issue requires further investigation, because it significantly impacts both the need for, and optimal timing of, infrastructure addi- tions to the corridor. Much of the historical growth in rail traffic has been fueled by expansion of Pacific Rim intermodal as well as Powder River Basin coal, but as a restructured economy emerges from the recession, it is not clear that these historical growth patterns will resume under changed economic conditions. As a result, it is essential to give attention to development of a rigorous process not only for estimating current train counts, but also for developing reasonable corridor-specific forecasts that are in line with national economic projections. Total Train Volumes Figure 3-13 maps daily rail volumes along the corridor for 2010, as derived from the FRA National Grade Crossing Inventory, with confirmation of passenger train counts based on Amtrak timetables. However, for the reasons given above, this case study uses 18 freight trains each way as reflective of forecast future year traffic volumes, rather than the 18 total freight trains shown in Figure 3-13. This may be an overly aggressive freight traffic forecast, but is needed for compatibility with the simulation validation benchmarks. Future Plans Wisconsin is currently seeking to enhance the Amtrak Hiawatha line to improve travel between Chicago and Milwau- kee (66). Its plan is to implement the Truesdell connection and extend the station platform at Milwaukee Airport. At the same time, there are plans to replace/repair two bridges near Wadsworth (67). These improvements would allow the num- ber of Chicago-Milwaukee Amtrak round trips to increase by Figure 3-13. Passenger and freight train volumes for the Chicago to Milwaukee Corridor.

54 1 to 3 trips per day (68) while reducing travel times by up to 30 percent (69). For the longer term (including extensions both to Green Bay and the Twin Cities), one of the major suggestions to improve the Chicago to Milwaukee corridor is the separating of CP operations at Truesdell and providing a separate line for these trains to Techny, where currently the CP trains turn off for Bensenville. Currently, freight trains from Bensenville yard join the corridor at Techny and share the CP line to Milwaukee, thus resulting in schedule conflicts with passenger trains. By diverting these freight trains to the parallel UP freight line, overall conflict could be reduced by separating freight and passenger trains on the southern half of the corridor. Building a connection at Truesdell would allow freight traffic to rejoin the route there. For the Chicago to Milwaukee segment, the 1997 Chicago/Milwaukee Rail Corridor Study70 proposed the following three capacity measures: • Triple track from Chicago Union Station to Rondout MP 32.5. (The section from Union Station to Western Avenue is already triple-tracked.) • Separate CP operations at Truesdell and provide a separate line for these trains to Techny, where today the CP trains turn off for Bensenville. • Provide three 2-mile freight sidings at 10-mile intervals north of Truesdell. In the years prior to the 1997 corridor capacity study, CP (mainly through its subsidiary Soo Line) purchased exten- sive stretches of track from failing railroads in the West and Midwest, many of which were in poor condition. CP opted to convert most of these railroads now under its control to single-track. CP finished single-tracking its line from St. Paul to Milwaukee just before the 1997 Chicago/Milwaukee Rail Corridor Study was performed. Subsequent to the study, there was continued activity of divestment and acquisition of rail lines by CP in the western states and along the Mississippi River. The 1997 study asserted that CP could handle all its freight traffic between Truesdell and Milwaukee on a single track because, indeed, it was already doing so. In view of subsequent divestment by CP, the 1997 study may have understated CP’s need for capacity in the corridor. The 1997 Chicago/Milwaukee Rail Corridor Study proposed that CP should sell one of its existing tracks to the State of Wisconsin for passenger trains and continue to use just one track for freight service as follows: • Adding three 2-mile freight sidings at 10-mile intervals north of Truesdell, to accommodate single-track operations by CP. • Upgrading parallel existing track, a distance of approx- imately 34 miles, to 110 mph dedicated exclusively to passenger use. The 1997 study assumed a volume of freight trains consis- tent with the capacity of the single-tracked line. However, the 1997 study was based on only 12 passenger round trips, and so its suggestion that this number of passenger trains could be handled over a 34-mile single-track segment is quite reason- able. A scenario that was tested adopts operational changes from the 1997 study that seem necessary given the traffic growth since the time of the study. This case study assessment assumes comingled, shared rather than dedicated, track oper- ation, in order to see whether the existing double-track line, particularly north of Truesdell to Milwaukee, can accommo- date the comingled increased passenger and freight volumes. For supporting this type of comingled double-track opera- tion, a key requirement is a passing capability to allow pas- senger trains to overtake slower-moving freight trains. Even though train volumes are high, the distance from Truesdell to Milwaukee is only 34 miles, therefore • A freight train could immediately follow a passenger train in each direction to utilize capacity in the “shadow” of the passenger train’s schedule slot. For example, a northbound freight could wait at Truesdell until the northbound pas- senger train passes. If the freight train then followed the pas- senger train, the freight train could likely reach Milwaukee and clear the line segment ahead of the next passenger train. • If an intermediate passing siding were needed, instead of building the three short passing sidings as proposed by the 1997 study, a single 6-mile-long triple track section could be built at equivalent cost, approximately midway between Truesdell and Milwaukee. This would result in triple track- ing 18 percent of the corridor and would reduce the length of the critical distance between clearance points from 34 miles down to 14 miles. As such, it appears that a comingled operation could be possible from Truesdell to Milwaukee using about the same level of infrastructure in the 1997 study. The case study tests the assumption that this level of infrastructure can indeed support the proposed comingled operations. The SU conflict identifier pinpoints conflicts that require mitigation with new infrastructure. In reference to the SU methodology, note the following: • Step 2, defined as the “do minimum” case, defines the infrastructure needs for adding passenger trains alone to the corridor. However, because the line is currently double tracked, there are no scheduled conflicts between the additional passenger trains north of Rondout. This indi- cates that the capacity of the existing double-tracked line is sufficient to support the needs of passenger service. • Step 3, defined as the prepare build case, defines the addition- al infrastructure needed for maintaining freight and existing

55 commuter, in addition to expanded passenger, train service on the corridor. The case adds freight trains along with the 19 planned additional passenger round trips. The case infra- structure is the same as the base and do minimum cases, and the trains will run comingled on all available track. • Figures 3-14 through 3-16 show the conflict identifier run for the prepare build case: – In the double-tracked territory on the north end of the line from Truesdell to Milwaukee, there are 37 total con- flicts vs. 38 passenger trains. This is 37/38 = 0.97 freight inter actions per additional passenger train between Truesdell and Milwaukee. This validates the earlier rec- ommendation for adding one 6-mile-long center passing siding between Truesdell and Milwaukee for supporting comingled freight and passenger train operations over this segment. – In the Metra commuter territory on the south end of the line, from Union Station to Rondout, there are 109 total conflicts between new and Metra commuter trains. This is 109/38 = 2.87 commuter train interactions per new pas- senger train between Truesdell and Milwaukee. It is clear that the level of Metra conflict south of Rondout is much greater than the freight conflict north of Truesdell and will require a more aggressive approach to capacity remedia- tion in this section. This result suggests that at least three sections of additional passing track will be needed in this 30-mile stretch to eliminate these conflicts between new and Metra trains. As a practical matter, this result supports the earlier study finding that one track would be needed the entire way from Chicago to Rondout to allow the pro- posed new service to operate alongside the existing Metra commuter trains. Finding: Just as in Case Study 1: St. Louis to Kansas City, the conflict identifier (CI) identified the same required infrastructure as the detailed MWRRS RTC-based analysis. This shows the ability of the conflict identifier tool to recog- nize a reasonable infrastructure requirement for heavily used shared freight corridors. In particular, the key areas of agree- ment between the conflict identifier analysis and the previous simulation study are the need for adding (1) an additional track from Chicago to Rondout for eliminating Metra commuter train conflict and (2) a passing track halfway between Truesdell and Milwaukee for allowing the added trains to overtake slower freight trains. 3.7 Summary of Findings In regard to screening methodologies: • Five methodological approaches to rail capacity analysis are documented in the literature. Note: Milepost O = Chicago; Milepost 87 = Milwaukee Figure 3-14. Conflict identification “prepare build” 12 a.m.–8 a.m.

56 • Although the data requirements of a parametric tool are minimal, they are actually not sufficiently tailored to local conditions to produce a credible corridor-specific screening assessment. • An optimization-based tool is not likely to prove useful for addressing the needs of a Web-based screening tool. The optimizing aspect, related algorithm performance issues, and questions regarding the reality of its dispatching capability render this tool unsuitable for the Web-based screening application. • Topological methods also show promise and can generate useful metrics. Although the approach was not selected for implementation here, in the future, compression function- ality could provide a useful add-on capability to the SU capacity screening tool. The main advantage of topological approaches is their ability to directly identify the bottleneck section(s) of a rail line, pointing directly to the locations where infrastructure additions are the most needed. In this regard, they provide similar functionality to the conflict identification approach because topological approaches can directly find the locations were infrastructure needs to be added. A compression-based methodology is compatible with the CS Study methodology that was proposed by AAR for capacity screening. In the future, consideration should be given to developing an enhanced compression capability to augment the current conflict identification tool. • In terms of analytical approaches, the conflict identification approach (adopted from the MWRRS Ideal Day method) for adding a siding wherever a conflict occurs was shown to give a reasonable first-cut assessment of infrastructure needs on light-density corridors. As enhanced by this study, the proposed conflict identification methodology is both quantitative and rigorous, without any subjective element or needing an experienced rail analyst, and the approach can be applied regardless of corridor density. This qualifies the conflict identification methodology for effective use as a feasibility screening tool. Phase I research indicates merits of this approach for screening projects. Note: Milepost O = Chicago; Milepost 87 = Milwaukee Figure 3-15. Conflict identification “prepare build” 8 a.m.–4 a.m.

57 • The screening tool also provides a simulation tool that can be used to both validate and support the credibility of the results of conflict identification. The simulation capability is provided as a core feature of the SU tool and has been demonstrated in the case studies. In regard to data needs and availability: • At the early stage of planning, proponents are largely “on their own” so that the method relies on publicly avail- able data. Because existing infrastructure is usually clearly visible in Google Earth™ satellite imagery, this can be considered a primary source of existing infrastructure data. Often, current track charts are publicly available or available on request from the freight railroad. • Traffic data can generally be derived from the FRA National Grade Crossing Inventory and/or from direct field obser- vations of trains moving past highway-grade crossings. State DOTs can directly obtain traffic data based on the STB Waybill Sample and can use this on a confidential basis. Alternatively, a cooperative freight railroad might be willing to supply the needed traffic data on request. Public agencies often can obtain data from a freight rail- road by executing a non-disclosure agreement. Even so, the freight railroads are not likely to be willing to com- mit significant resources to a project until it reaches more advanced project development stages (e.g., EIS) and also on the likely availability of funding to actually complete the project. • It should be noted that unit costs from other studies need appropriate adjustment for inflationary changes and regional cost adjustment. • The three case studies indicate the applicability and useful- ness of the tool on extremely complex corridors. The case studies show that the conflict identification methodology has been successfully extended so that it is effective for both high-volume and low-volume rail corridors. – The St. Louis to Kansas City infrastructure recommen- dation matches what was recommended by the MWRRS RTC-based analysis. Figure 3-16. Conflict identification “prepare build” 4 p.m.–12 p.m. Note: Milepost O = Chicago; Milepost 87 = Milwaukee

58 Figure 3-17. Summary of SU analysis, Chicago-Milwaukee Corridor. Note: Step 1 chart is for 12 A.M.–8 A.M. on day of analysis. Other charts are for 4 P.M. to 12 A.M.

59 – The NEC study was undertaken as a double-blind exercise without a validation benchmark. However the results of both the conflict identification and simulation screening indicate the potential feasibility of restoring full Norfolk Southern freight service (daytime as well as nighttime) along this section of the Northeast Corridor, if the high- speed Acela Express service were shifted away from the existing tracks onto a new parallel high-speed alignment. This suggests the potential for a substantial freight benefit associated with the implementation of true high-speed service between Baltimore and Wilmington. It is suggested that this potential be further explored by future studies. – For the Chicago to Milwaukee corridor, the SU tool con- firms the capacity mitigation that was developed by the earlier 2004 feasibility study. For supporting shared-use operations, the key areas of agreement needed in this cor- ridor are for adding a track from Chicago to Rondout (for eliminating Metra commuter train conflict) and for adding a passing track halfway between Truesdell and Milwaukee for allowing the added trains to overtake slower freight trains. • The three high-volume case studies are far more complex than the screening requirement of more typical rail cor- ridors that prospective DOT rail users are likely to encounter. For DOT user training purposes, it is recommended that simpler demo case studies be developed. The conflict identifier tool performed well in replicating the results of previous, detailed feasibility studies on the two cor- ridors (St. Louis to Kansas City, and Chicago to Milwaukee) for which direct benchmark comparisons could be performed. For the Northeast Corridor, the conflict identifier gave a rea- sonable and plausible result, both in regard to its assessment of current operations (e.g., minimal conflicts) and to the prospect for restoring freight if the Acela Express operations were moved to a separate alignment. This result is reasonable for the NEC because freight did successfully comingle with passenger trains there, prior to the introduction of the Acela Express service.

Next: Chapter 4 - Recommended Approach, Implementation, and Suggested Research »
Web-Based Screening Tool for Shared-Use Rail Corridors Get This Book
×
 Web-Based Screening Tool for Shared-Use Rail Corridors
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s National Cooperative Freight Research Program (NCFRP) Report 27: Web-Based Screening Tool for Shared-Use Rail Corridors describes a tool designed to help perform preliminary feasibility screening of proposed shared-use passenger and freight rail corridor projects. The web-based screening tool described in the report is available on the U.S. Federal Railroad Administration website.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!