National Academies Press: OpenBook
« Previous: Front Matter
Page 1
Suggested Citation:"CONTENTS." National Academies of Sciences, Engineering, and Medicine. 2012. Innovative Bridge Designs for Rapid Renewal Toolkit. Washington, DC: The National Academies Press. doi: 10.17226/22697.
×
Page 1
Page 2
Suggested Citation:"CONTENTS." National Academies of Sciences, Engineering, and Medicine. 2012. Innovative Bridge Designs for Rapid Renewal Toolkit. Washington, DC: The National Academies Press. doi: 10.17226/22697.
×
Page 2

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

xi CONTENTS 1 CHAPTER 1 Introduction 3 Overview of the ABC Toolkit 5 Objectives for the ABC Toolkit 6 Use of the ABC Toolkit 7 CHAPTER 2 Standard Concepts and Details for ABC 7 Introduction 8 Design Considerations for ABC Standard Concepts for Modular Systems 10 Design Considerations for ABC Connections 12 ABC Standard Concepts and Details 31 CHAPTER 3 Sample Design Calculations and Specifications for ABC 31 Introduction 32 Recommended LRFD Design Specifications for ABC 33 ABC Sample Design Examples 36 Recommended ABC Construction Specifications for LRFD 39 Selected Bibliography 41 APPENDIX A ABC Standard Concepts

xii 119 APPENDIX B ABC Sample Design Calculations 277 APPENDIX C Recommended ABC Design Specifications 285 APPENDIX D Recommended ABC Construction Specifications Online version of this report: www.trb.org/Main/Blurbs/168046.aspx.

Next: 1 INTRODUCTION »
Innovative Bridge Designs for Rapid Renewal Toolkit Get This Book
×
 Innovative Bridge Designs for Rapid Renewal Toolkit
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s second Strategic Highway Research Program (SHRP 2) SHRP 2 Report S2-R04-RR-2: Innovative Bridge Designs for Rapid Renewal: ABC Toolkit describes standardized approaches to designing and constructing complete bridge systems for rapid renewals.

The report includes design standards and design examples for complete prefabricated bridge systems, and proposes specification language for accelerated bridge construction systems, which adheres to the American Association of State Highway and Transportation Officials (AASHTO) Load and Resistance Factor Design (LRFD) Bridge Design and Construction Specifications.

ABC Standard Concepts: The Lateral Slide, produced as an addendum to the Innovative Bridge Designs for Rapid Renewal: ABC Toolkit, provides additional detail on the lateral slide construction technique.

An e-book version of this report is available for purchase at Amazon, Google, and iTunes.

The R04 MathCAD files for the SHRP 2 Report S2-R04-RR-2 are available to help illustrate the sample accelerated bridge construction (ABC) design calculations. The sample design calculations serve as training tools for engineers to increase familiarity with ABC design issues and criteria.

A demonstration project on US 6 over the Keg Creek near Council Bluffs, Iowa used the accelerated bridge construction standards developed as part of Renewal Project R04.

The following three videos were produced related to the Keg Creek project:

ABC for Everyday Bridges (18:39) highlights the specific techniques used to deliver a new bridge with only a 10-day closure.

One Design—10,000 Bridges (9:46) describes a tool kit for designing and constructing bridges that brings home the benefits of accelerated bridge construction techniques so local contractors can use typical equipment to build bridges quickly and efficiently.

Time-Lapse Video (1:30) shows ABC techniques being used by a local contractor with standard equipment to replace the Keg Creek three-span bridge.

A second demonstration project on I-84 in New York also used the ABC Toolkit in applying bridge slide technologies, which were used over two weekend nights to save millions of dollars and two years of traffic detours. The "Two Weekend Nights" video documents the successful use of the technology. A case study I-84 bridge project in also available.

The R04 Renewal project also developed a half- and full-day presentations to help facilitate training on of the accelerated bridge process to interested parties.

In June 2013, SHRP 2 produced a Project Brief on the project that developed the ABC Toolkit.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!