3 Delivery and Disassembly Operations
Pages 26-33

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 26...
... to transport muni found in the storage igloos will be overpacked and tions from storage to a container handling building placed on a separate leaker pallet, to be transported and (CHB) and the use of the baseline rocket shear machine processed after all nonleaking munitions of the same (RSM)
From page 27...
... SOURCE: Briefing by the Bechtel Parsons Blue Grass team to the BGCAPP MDB Design Review, February 15, 2005. MCE was accepted by the Department of Defense Ex- is moved past the explosion containment vestibules plosive Safety Board.
From page 28...
... Manual container along with other nose closures. The projec tile burster well is tested to verify the absence of a burster, and the projectile is lifted by the robotic arm, 3 rotated, and placed vertically in a tray for conveying to In June 2004, the Department of the Army issued Implementation Guidance Policy for Revised Airborne Exposures Limits for the MWS room.
From page 29...
... As of February 2005, the Bechtel Parsons Blue Grass There are two top punches with spray heads for supply- Team was planning to further modify the RSM design ing washout liquid and three bottom punches for drain- by incorporating a special cutting tool for the cutting ing agent and washout liquid. Both top and bottom positions at the interface of the rocket warhead and punches penetrate the firing tube and warhead cavity rocket propellant sections (Cut 4)
From page 30...
... SOURCE: U.S. Army and and the smallest possible amount of aluminum from Bechtel Parsons Blue Grass Team responses on May 2, 2005, the adjacent warhead section.
From page 31...
... The committee believes that separating in overpacks, will be processed in the RSMs at the end cut rocket segments into buckets containing propellant of the GB rocket campaign. Spacers as long as the and buckets containing aluminum warhead segments rocket section that the warhead would normally be at- will require reliable software for managing the robotic tached to in an assembled rocket will be used to facili- feeding of the segments to the EBH system.
From page 32...
... The trays loaded with projectiles are then trans- tions are moved by conveyor to a bucket similar to ferred into the ECR through a blast door to the unload- that used for rocket segments. The bucket follows the ing position, where a multiaxis pedestal-mounted ro- same path that buckets containing rocket segments botic arm picks each projectile from the tray and moves follow into the EBH room and the EBHs; however, it progressively in a nose-up orientation through three for projectiles there is no requirement for segregation disassembly stations in the LPMD machine to remove of projectile parts as there is for processing rocket (1)
From page 33...
... As previously stated, the nose closures associated with these projectiles were After weighing and determining that the weight re placed in a special container on the projectile trays for duction is within target values (that is, that less than 2 subsequent treatment along with the washed-out pro- percent of agent remains) , the washed-out projectile is jectile bodies in one of the MPTs.