The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.
From page 24... ...
The size of these systems is limited only by the replacement crane capacity since all the structural support is provided by a stainless steel shell which contains the refractory. The Defense Waste Process Facility at Savannah River Site is the largest production melter of this type ever built.
|
Key Terms
This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More
information on Chapter Skim is available.