From page 13...
... ; and the utilization of "occupied/ unoccupied temperature set locks." Other sources noted that the best strategy for implementing temperature settings was to reset thermostats incrementally CHAPTER FOUR ENERGY EFFICIENCY PRACTICES: MANAGEMENT AND OPERATIONS Box 5 Practice Metrics Key Following the title of each practice in chapters four and five, icons representing cost and payback are listed. Icon values are as follows: Low Cost = $ Med Cost = $$ High Cost = $$$ 0–2 year Payback = 2–5 year Payback = 5–10 year Payback = 10+ year Payback = Example: $$⎟  = this improvement has a Medium Cost and 5- to 10-year payback.
From page 14...
... . of energy savings, with many commenting that without automation, energy efficiency improvements would not have been identified in the first place.
From page 15...
... . Fans -- Cooling Tower $ - $$⎟  Retrofit of cooling tower fans with variable drive was identified by larger airports as an energy efficiency strategy with paybacks ranging from 2 to 5 years and low to medium cost.
From page 16...
... WEBLINK -- Energy Efficiency Handbooks These handbooks by the California Energy Commission include comparisons of different types of energy audits and information on identifying energy efficiency projects. http://www.energy.ca.gov/reports/efficiency_handbooks/ O&M Assessment $ - $$⎟  -  An O&M assessment seeks to reduce operating costs and improve efficiency by recommending "low-cost changes in O&M practices that can improve building operation" (PECI 1999b, pp.
From page 17...
... . Specific projects that warrant commissioning as identified by the PECI include: • All projects that include controls • Pneumatic equipment • Integrated systems • HVAC-related plant equipment and air distribution systems • Lighting sweeps or day-lighting controls • Energy management systems and control strategies • Variable speed drives in motors • Ventilation air and control • Building pressurization control • Refrigeration improvements • Capacity controls for heating and cooling plant equipment (PECI 1998, p.
From page 18...
... Energy efficiency benefits resulting from continuous commissioning were reported to be significant with more than $3 million in measured and verified energy savings over a 5-year period by DFW. In studies of this assessment method outside the DFW facility, it was reported that following implementation, "the average measured utility savings are about 20%, with simple paybacks often in less than two years" (Liu 2002, p.
From page 19...
... . Energy Efficiency Specific Project Criteria $ - $$ Many survey respondents indicated that design and construction standards at their facility include aspects of energy efficiency.
From page 20...
... This communication strategy has proven to raise awareness about energy efficiency issues and provide savings through vigilance on the part of O&M staff. At another airport, energy efficiency program staff has made numerous presentations to stakeholder groups including tenants and are seeing gradual but positive changes in attitudes towards energy efficiency.
From page 21...
... • Identify improvements to O&M practices by using systematic assessment for both new and retrofit projects – Methods of systematic assessment include energy audits and O&M assessment – Multiple forms of commissioning can be used depending on project type and scope. • A variety of programs and arrangements are used by airports to guide, implement, and monitor energy efficiency – Highlight energy efficiency within new project criteria – Utilize temporary settings for underused systems and spaces – Include energy efficiency requirements within O&M service contracts.