From page 60...
... 58 APPENDIX B Examples of Specifications Missouri specification for 1 inch HIR Wisconsin FDR specification Maine FDR specification
From page 61...
... × 100 20 2.2 The virgin hot mix asphalt shall conform to Section 403 of the standard specifications. When the virgin hot mix asphalt is placed simultaneously with the recycling operation, the point of sampling of virgin hot mix asphalt will be from the truck transports in accordance with AASHTO T168.
From page 62...
... The recycled asphalt mixture shall be compacted in accordance with Section 402. The recycled pavement shall be tacked in accordance with Section 407 prior to the virgin hot mix asphalt overlay.
From page 63...
... No direct payment will be made for water added to the emulsified asphalt. 6.3 Payment for the virgin hot mix asphalt will be in accordance with Section 403.
From page 65...
... square mesh sieve. 307.07 Weather Limitations: Full Depth Reclamation work shall not be performed when weather conditions are such that proper pulverizing, spreading, or compaction of the pulverized material cannot be accomplished.
From page 66...
... All extra material, whether shown on the plans or added, will meet the requirements of Subsection 307.021 - New Aggregate and Additional Recycled Material, of this Special Provision. The Contractor will use recycled pavement to the extent it is available, in lieu of untreated aggregate surface course.