2 First-of-a-Kind Testing
Pages 15-23

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 15...
... These abnormal conditions and their whether the testing supports the systemization of the SCWO impact on the system are addressed in more detail in the folsystem at Blue Grass Chemical Agent Destruction Pilot lowing sections of the report. Also, as discussed below in the Plant (BGCAPP)
From page 16...
... These are either areas of TABLE 2-2  Simulated Blended VX and Energetics particular criticality to the overall SCWO process, or areas Hydrolysates where significant challenges were encountered. This is not Constituent Wt-% intended to be a comprehensive review of the FOAK test report, so not every aspect of the FOAK testing and results Deionized water (H2O)
From page 17...
... SCWO reactor from migrating up a ruptured thermowell. The maximum average corrosion rates for the liners (A liner failure would, however, necessitate a shutdown.)
From page 18...
... The highest maximum average corrosion rates during GB testing occurred when running the SCWO Recommendation 2-1. The Blue Grass Chemical Agent Deat 1200°F and was 1.8 mil/hr for the liner and 1.9 mil/hr for struction Pilot Plant staff should shorten the liner change-out the thermowells.
From page 19...
... The Blue elemental sulfur additive: Grass Chemical Agent Destruction Pilot Plant project staff should use existing corrosion data to estimate the lifetime of 1.  oes the elemental sulfur additive perform equiva D these new thermowells.
From page 20...
... The simu- final 100-hr test with simulated blended GB and energetics lants with elemental sulfur were processed in an equivalent hydrolysate, the maximum average corrosion rate for the manner with similarly complete oxidation of the organics liner was 1.1 mil/hr and for the thermowells was 1.5 mil/hr in the FOAK testing. This addresses the first two concerns (BPBGT, 2013)
From page 21...
... Recommendation 2-5. The Blue Grass Chemical Agent Destruction Pilot Plant project staff should review the main tenance and start-up plan for the air compressors so that they Functionality During FOAK Testing are maintained to industry standards.
From page 22...
... The Blue Grass Chemical Agent TOC value is low then the organics have been destroyed. Destruction Pilot Plant supercritical water oxidation system During different FOAK tests, the TOC analyzer inlets be test plan should ensure that the recipe for the blended H came plugged.
From page 23...
... The various high-pressure air for the supercritical water oxidation system to be used at the compressor failures gave the operators additional practice Blue Grass Chemical Agent Destruction Pilot Plant were in shutting the reactor down and bringing the reactor up to met. The processes and subsystems, inclusive of mainteoperational (steady-state)