... 149 APPENDIX J Sample RSA Reports
From page 150...
... 150 PRELIMINARY DESIGN ROAD SAFETY AUDIT June 29, 2001 (Note: This is a real Road Safety Audit report, but the names of the roads and the County have been changed.) Project Location: The project is located at the existing interchange of I-118 and SR 10/Riverview Drive.
From page 151...
... 151 May need additional R/W for Signal Strain Poles to provide for horizontal clearance. Consider increasing the radius of Ramp C/Riverview Drive to 75 ft.
From page 152...
... 152 ROAD SAFETY AUDIT REPORT Intersection VT Route 100 / US 2–Class I TH Washington County 05 June 2001 (Note: This is a real Road Safety Audit report, but the names of the roads and the County have been changed.) Stage of Road Safety Audit The audit review team reviewed planning stage documentation for this report.
From page 153...
... 153 Audit Team Findings and Guidance 1. Finding 1(a)
From page 154...
... 154 12. Finding: Concern of all traffic types being to safely traverse during construction activities.