From page 100...
... 100 undertook the necessary geotechnical investigation and testing, which resulted in a geotechnical design report that quantified the actual scope of the emergency repair. During the design period, MoDOT conducted over-the-shoulder reviews of the design–build subcontractor's design work, further expediting the approval of the soil nail wall design.
From page 101...
... 101 from the Cooper River Bridge arbitration. As for those design professionals who are working directly for an owner and creating RFP documents, the standard of care for deficiencies in those documents is not well-developed, and there is no real case law to help the industry at this point in time.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.