... E-1 A P P E N D I X E Solar Feasibility Assessment -- Monterey Regional Airport
From page 179...
... MONTE So REY RE lar Fea GIONA sibility L AIR Study PORT
From page 181...
... MONTERE EXECU As part of a solar demonstr value of financing We looke analysis is lots are b the exisn future dev Our analy assumpo is a Powe opmize only to pr in Year 6. Locaon a receive bi Net Energ building.
From page 182...
... MONTERE SITE AS We comp areas that cost of th for a gro potenal Terminal Build Terminal Build Terminal Build Terminal Build Northeast Gro The termi proximity building i and some be availab edge shou be approx accommo The parki needed. T will provid In the eve a solar ins in detail i ground in 3 Assumes 2 Y REGIONAL SESSMEN leted a high are suitable e solar syste und installat capacity in ea SITE ing Roof ing – Parking Lo ing – Parking Lo ing – Parking Lo und Area nal building to the termi s approximat obstrucons le for the so ld be approx imately 20 f date a 117 kW ng lot at the w wo single an e an addio nt that the s tallaon at t n the followi stallaon at t 0% panel efficie AIRPORT – S T level site as for rooop, m, by selec ion.
From page 183...
... MONTERE AERIAL V Y REGIONAL IEW OF IDE AIRPORT – S NTIFIED LO R NORTHEA OLAR FEASI CATIONS ROOF ECOMMENDE ST GROUND L BILITY STUDY RECOMME TERMINAL BU TOP & CARPO D OCATION NDED ILDING RT LOCATIONS Page | 5
From page 184...
... MONTERE ECONO For the ec O A U C p Po PV El A A TARIFF There are Regional A Net Energ the termi In other w transmiss Since the electricity meter. Renewab governme geograph exported meters (b account m In the cas ground m the energ generao 4 hp://ww 5 Local Gov district, poli powers aut individual c campus)
From page 185...
... MONTERE generao accounts. The follow Given tha terminal preferable condion mount so ARRAY The Site A idenfied thorough expected and need determine Monterey the table T N R ENERGY As meno based on bill saving Y REGIONAL n credits are The generat ing chart illu t under this meter repre .
From page 186...
... MONTERE NEM OPT The analy were prov an averag Under the rate sche maximum the availa secure th following 1.
From page 187...
... MONTERE providing airport's t The table TARIFF M RES BCT m SOLAR The table opons. T TARI NEM RES BCT FINANC There are i)
From page 188...
... MONTERE CASH PU Under sel of financi operaon underpro potenal Financing Improvem below pro expected Exp 1st Year 5 Year N 10 Year 30 year Net Pres * Under the *
From page 189...
... MONTERE POWER P Under thi The airpo in the Pow allows hi MACRS)
From page 190...
... MONTERE PPA with A PPA con contract t including exempt fi project. T negoate to opmiz to private nominal s have inclu buyout va 1st Year 5 Year N 10 Year 30 year Net Pre *
From page 191...
... MONTERE CONCLU Based on as the gro Upon com benefits: offset of 561kWdc to 442kW tariff is m the A 6 ra Following the capita FAA grant the RES B discount the airpor term bene Y REGIONAL SION the above an und area in t pleon of th The NEM tar generaon c based on the dc based on ore cost effe te structure. our analysis l cost of the , which could CT system.