... 68 5.1 Introduction This guidebook concludes with a discussion of recent and ongoing planning for the ChicagoSaint Louis high speed rail implementation on the UP and CN line. This line will host high speed trains in the near term, along with increasing amounts of freight and conventional passenger services.
From page 69...
... Taking Shared-Use to the Next Level: Chicago–Saint Louis High Speed Rail 69 The outcome of that study was a judgment that such an infrastructure approach was too expensive and that efforts should instead focus on upgraded speeds and frequencies using existing, shared alignments with freight carriers. The 1994 IDOT Chicago-St.
From page 70...
... 70 Capacity Modeling Guidebook for Shared-Use Passenger and Freight Rail Operations 5.4 A Timely Example The study team believes the Chicago-Saint Louis project provides valuable insights for those considering major passenger rail corridor upgrades, on shared track, in other corridors. When completed it will be the only example of a freight carrier-dispatched and owned alignment with a high number freight trains as well as 110 passenger mph trains.
From page 71...
... Taking Shared-Use to the Next Level: Chicago–Saint Louis High Speed Rail 71 The official Illinois vision statement for the project is as follows: "More than 90 percent of the over 35 million corridor trips have origins or destinations in Chicago or St. Louis.
From page 72...
... 72 Capacity Modeling Guidebook for Shared-Use Passenger and Freight Rail Operations capacity modeling, using the Rail Traffic Controller (RTC) operations simulation program, was performed after loading the infrastructure data and train service specifications that are standard for use of the RTC program.
From page 73...
... Taking Shared-Use to the Next Level: Chicago–Saint Louis High Speed Rail 73 the conclusion of a two-decade period of industry expansion where even basic track materials were often priced at a premium and in short supply. A UP modeling expert was dedicated, at IDOT expense, to work solely on the Saint Louis service alignment along with two external consultants approved jointly by UP and IDOT.
From page 74...
... 74 Capacity Modeling Guidebook for Shared-Use Passenger and Freight Rail Operations operations as a condition of new public investment in their facilities. While a detailed description of the negotiations process is beyond the scope of this study, it may be noted that the areas of greatest challenge have proven to be: • Measurement of service performance.
From page 75...
... Taking Shared-Use to the Next Level: Chicago–Saint Louis High Speed Rail 75 In Phase Two nine round trips, including the five above and four additional round trips, will travel each direction daily. Limited stop high speed express trips would take 3 hours and 50 minutes from Chicago to St.
From page 76...
... 76 Capacity Modeling Guidebook for Shared-Use Passenger and Freight Rail Operations Finally, it should be noted that a limited portion of 110 mph Amtrak service began in November 2012 over a 14-mile segment between Dwight and Pontiac. IDOT and Union Pacific are carefully monitoring train and signal performance as well as engineering maintenance issues associated with 110 mph operations as providing context for the large scale rollout of higher speeds in the next few years.