... 9mapping projects. However, UIT believes that with appropriate incorporation of new ideas, an S-wave system tailored to deep utilities can be developed.
From page 10...
... 10 available because of FCC regulation of the frequency bands and power levels (lowering the frequency requires raising the power to maintain the same performance)
From page 11...
... 11 It became clear during the course of the project that no innovation prototype for seismic reflection technology would be ready within the schedule and budget of the R01C project. This technology was not included in the field-testing task.
From page 12...
... 12 into practice because of time and budgetary constraints. The prototype was programmed to use both the TOF and the amplitude techniques.
From page 13...
... 13 rotating EM field. Metallic materials within the range of the instrument disturb the EM field as seen by the sensing coils.
From page 14...
... 14 can be performed. The level of effort required to complete this prototype puts it outside the scope of the R01C project.
From page 15...
... 15 be attached to a vehicle or may be hand carried. It will include GPS and GPRS data link.
From page 16...
... 16 end users informed about the progress of R01C, as well as to collect feedback on the direction of the project. User Panel Selection and Interaction A user panel was formed during Phase 1 to serve as an audience and review body for both R01C and R01B that would be representative of those who would use the tools or products resulting from this work.