... 1 In the 1990s, the general public began insisting that planned highway and bridge projects be completed quicker than possible using the Design-Bid-Build (DBB) construction project delivery system which had dominated the industry since the 1930s.
From page 2...
... 2 Guide for Design management on Design-Build and Construction manager/General Contractor Projects approach, agencies can assume different levels of involvement. Some agencies strongly rely on performance specifications or on long-term strategic partnerships with D-B entities to maintain a limited involvement.
From page 3...
... Summary 3 optimum proportions for project success. Everything should be done to retain the CM as early as possible.