... 110 A p p e n d i x C C.1 purpose The purpose of this Standard Operating Procedure (SOP) is to provide general procedures for geophysical data collection during subsurface utility field investigations using the SHRP 2 R01B time domain electromagnetic induction (TDEMI)
From page 111...
... 111 at the designated project location. For TDEMI DGM activities this equipment includes • RTK GNSS; and • SHRP 2 R01B TEM 5-by-1 sensor array on metal-free platform a.
From page 112...
... 112 • Noise threshold -- detection capabilities of electromagnetic induction (EMI) instruments can be adversely affected by natural and/or cultural features (high ambient moisture, surface or near-surface metal, lightning, power lines, etc.)
From page 113...
... 113 C.7.4 Partial Coverage Geophysical Surveys For partial coverage DGM, digital geophysical data are collected in either a designed pattern or a meandering path fashion. Data sets are collected in the same manner as for full coverage digital grid surveys with the only exception being that 100% coverage is not required.
From page 114...
... 114 C.8.2.1 Equipment Warm-Up ApplicAbility TEM procedure Minimize sensor drift due to thermal stabilization. Most instruments require several minutes to acclimate to current weather conditions (temperature, humidity, etc.)
From page 115...
... 115 with the site position instrumentation and in the projectspecific coordinate system. Those chain endpoint positions should be included in the project location survey file.