... 98 A p p e n d i x A A.1 purpose The purpose of this Standard Operating Procedure (SOP) is to provide general procedures for geophysical data collection during subsurface utility field investigations using SHRP 2 R01B multichannel ground-penetrating radar (GPR)
From page 99...
... 99 designated project location. This equipment and software include • RTK GNSS; • RTS; • TerraVision II multichannel GPR array a.
From page 100...
... 100 A.6.2.1 Lane Spacing During data collection, TerraVision II parallel transects should be collected with a minimum of two-channel (antenna) overlap to ensure full coverage of the project site over all accessible areas.
From page 101...
... 101 includes, at a minimum, the checklists and forms included with this SOP and other relevant SOPs. These documents are delivered to the Field Lead at the end of each production day.
From page 102...
... 102 following steps are recommended for performing lane deviation documentation: • Deviations will be tied to an individual data set. If deviation is necessary, a sketch and/or photograph of the data set boundary will be denoted with the cause of the deviation.
From page 103...
... 103 foil tape. The foil tape is used for the Channel Alignment Check and does not affect the other checks and calibrations.

Key Terms