Skip to main content

Currently Skimming:


Pages 4-7

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 4...
... 4C h a p t e r 1 1.1 Objective The second Strategic Highway Research Program (SHRP 2) Reliability focus area has commissioned roughly 30 research projects costing approximately $27 million; together these projects were designed to lay the foundation for understanding and improving travel time reliability.
From page 5...
... 5 The Archive includes more than 35 Reliability and Reliability-related projects. At the time of this writing, a total of 526 Reliability-related artifacts have been stored or identified for storage in the Archive.
From page 6...
... 6Table 1.1. List of Archived and To-Be-Archived Projects (continued)
From page 7...
... 7 Table 1.2. Summary of Artifacts Project Document Spreadsheet Data Set Code Other Total L01 5 0 0 0 0 5 L02 15 1 5 0 0 21 L03 10 110 31 4 0 155 L04 9 0 2 3 0 14 L05 9 4 0 0 0 13 L06 5 0 0 0 0 5 L07 6 1 5 1 0 13 L08 12 9 1 2 0 24 L10 4 0 1 1 0 6 L11 6 1 2 0 0 9 L12 5 0 0 0 0 5 L13 5 0 0 0 0 5 L13A 8 0 0 0 0 8 L14 17 0 3 0 0 20 L15A 3 0 0 0 0 3 L15B 3 0 0 0 0 3 L15C 3 0 0 0 0 3 L15D 3 0 0 0 0 3 L16 0 0 0 0 0 0 L17 14 0 0 0 0 14 L32Ba 0 0 0 0 0 0 L32Ca 0 0 0 0 0 0 L33 10 1 35 13 4 63 L34 4 0 0 0 0 4 L35A 6 2 7 0 0 15 L35B 6 14 5 0 0 25 L38A 4 0 5 0 0 9 L38B 4 0 5 0 0 9 L38C 4 0 5 0 0 9 L38D 4 0 5 0 0 9 L36 6 0 0 0 0 6 L55 3 0 0 0 1 4 C04 8 0 6 0 0 14 C05 6 0 4 0 0 10 C10Aa 0 0 0 0 0 0 C10Ba 0 0 0 0 0 0 C11 6 1 0 0 0 7 R11 7 0 0 1 0 8 S04A 4 0 1 0 0 5 Total 224 144 128 25 5 526 a Data are not available at this time.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.