Skip to main content

Memorial Tributes Volume 6 (1993) / Chapter Skim
Currently Skimming:

Harry F. Barr
Pages 12-17

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 12...
... so O~V7 J , WVI
From page 13...
... Barr worked on a tank development project en cl on a lightweight flying bomb. Following his war projects, he was promoted to Cadillac clivisional engineer in charge of engines.
From page 14...
... Barr was elected vice-president of General Motors in charge of the engineering staff, a post he held until his August 1969 retirement. The engineering staff's mission was to explore and develop future vehicles en cl technologies en cl to coordinate corporate safety programs.
From page 15...
... Barr supervised included thicker laminate windshield glass, beginning with the 1966 models, to prevent ejection from the vehicle; energy-absorbing steering columns in 1967; and better highway design. This work was based on a research program at the GM Proving Ground, which demonstrated that clearing obstacles from roadsides can reduce the severity of injuries in single-car accidents.
From page 16...
... "The engineer must expect to encounter failure. In fact, failure is a reality at some stage in most engineering projects.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.