... 40 C h a p t e r 6 6.1 Study area The Southwest Corridor Plan, which is illustrated in Appendix A, integrates multiple efforts: local land use plans to identify actions and investments that support livable communities; a corridor refinement plan to examine the function, mode, and general location of transportation improvements; and a transit alternatives analysis to define the best mode and alignment of high-capacity transit to serve the corridor. The plan is a partnership between Metro, Multnomah County, Washington County, the Oregon DOT, TriMet (the Portland region transit agency)
From page 41...
... 41 Figure 6.1. Southwest Corridor project map.
From page 42...
... 42 Figure 6.4. Cross sections of Scenarios 5 and 8.
From page 43...
... 43 Figure 6.6. Variable message sign (VMS)
From page 44...
... 44 Figure 6.9. Scenario coding flowchart for Scenarios 4, 5, 7, and 8 (BRT in dedicated right-of-way)