Skip to main content

Currently Skimming:


Pages 147-150

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 147...
... C-1 Quick Start Guide The purpose of this Quick Start Guide is to assist the experienced practitioner in developing information for regulatory agencies to document the likely impact of bridge runoff on a specific receiving water (Impact Assessment) and to determine the most cost effective BMP using the BMP Evaluation Tool if runoff treatment is required.
From page 148...
... C-2 in the discharge of pollutants as implemented in the applicable NPDES or other regulatory permit, then treatment BMPs should be implemented either at the bridge crossing itself or offsite (preferred for performance and cost reasons)
From page 149...
... C-3 Figure C-1. BMP flowchart.
From page 150...
... C-4 On the bridge deck: • PFC These BMPs were selected for their performance, generally broad compatibility with highway physical site constraints, and familiarity to, and common use by DOTs. The practitioner is not constrained by these choices, and other BMPs may be a better fit for site conditions.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.