Skip to main content

Currently Skimming:


Pages 12-13

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 12...
... 12 C h a p t e r 1 This final report documents the activities performed during Phase 1 and Phase 2 of SHRP 2 Project L08, Incorporating Travel Time Reliability into the Highway Capacity Manual. The final report articulates the how and why of key decisions made and key activities undertaken during the project so that the logic and rationale are not lost to future researchers and practitioners who aim to build on the work completed in this effort.
From page 13...
... 13 • Develop travel time reliability as a performance measure in the HCM2010 for urban street facilities; and • Address freeway and urban streets in a corridor context. These procedures should inform planning, preliminary engineering, design, and systems operations and management.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.