Skip to main content

Currently Skimming:


Pages 9-11

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 9...
... 9 requirements such as hammer size, cushion replacement, jetting limitations, and maximum stress levels in driving the piles. These combined performance and design specifications are often referred to as "composite specifications" or "mixed specifications."32 While liability will be discussed in depth later, it is worthwhile for readers to note that composite specifications are often the most complicated to resolve when problems arise, as contractors and owners will each view the specification as being "more" one way or the other -- depending on what it is in dispute.
From page 10...
... 10 change orders when the prescriptive specification was inadequate. Consider the area of fire protection sprinkler systems.
From page 11...
... 11 models, such as texture/texture loss and skid resistance. Warranties have been more widely applied to HMA pavements than to PCC pavements.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.