From page 13...
... 13 This chapter provides a description and discussion of each of the six (Missouri, Idaho, Kentucky, Kansas, Oregon, and Utah) state's Practical Design policy and procedures.
From page 14...
... 14 practical Design process and guidelines MoDOT's Practical Design process was first documented in Practical Design Implementation (21)
From page 15...
... 15 state that provides specific design guidance under its Practical Design policy.
From page 16...
... 16 zone. Rather than create a wider clear zone at high cost, it was determined that the application of edge rumble strips would be a more cost-effective alternative based on its crash reduction potential.
From page 17...
... 17 standards that are appropriate to the context of the surroundings. Our goal is to get the best value for the least cost.
From page 18...
... 18 VE is normally reserved for larger-scale projects with a high potential for savings, its underlying principle of identifying less expensive, but acceptable, design elements is applicable to Practical Solutions, which also has the objective of satisfying the project purpose and need cost-effectively. Consideration of Safety Impacts A stated goal of ITD's Practical Solutions policy is that ".
From page 19...
... 19 it had to use available funds more efficiently; hence, Practical Solutions emerged as the means to achieve that goal. The development of Practical Solutions was a top down process, starting with the KYTC highway engineer, who with other staff examined Missouri's program.
From page 20...
... 20 several design elements -- pavement and shoulder widths, curve radius, pavement and shoulder cross slopes, grade, stopping sight distance, and passing sight distance -- for three classes of roads: two-lane arterials, rural collectors, and rural local roads. These tables are found in Appendix F
From page 21...
... 21 Practical Solutions and 3R Improvements KYTC has guidelines for 3R projects. It believes that in a way they have been applying Practical Solution principles to 3R projects for many years.
From page 22...
... 22 practical improvement process and guidelines KDOT initially programs projects in its planning division. Projects reach the design office with a general scope and budget, which usually cannot be exceeded.
From page 23...
... 23 and where there may be historical, environmental, and social concerns that need to be considered. In such situations, the goal may not be to reduce the cost of the project but to address those needs cost-effectively.
From page 24...
... 24 TABLE 4 SAVINGS OF PRACTICAL IMPROVEMENT PROJECTS IN KANSAS Option Shoulder Width Foreslope Rate Clear Zone Width, ft Construction Cost A 10 6 30' $8,670,000 B 10 4 34' $8,340,000 C 8 6 30' $8,350,000 D 8 4 34' $7,930,000 TABLE 5 KDOT'S PRACTICAL IMPROVEMENTS ALTERNATE PROJECT SCOPE -- ExAMPLE 3
From page 25...
... 25 oregon DepartMent of transportation Background ODOT initiated its Practical Design policy in 2009. As in other states, it was instituted as a strategy to stretch scarce dollar resources.
From page 26...
... 26 SCOPE Integration Questions: ✓ Does this project address the purpose and need? Does it meet the project goals?
From page 27...
... FIGURE 3 Project delivery life-cycle model for Oregon. Source: ODOT Practical Design Guidebook (28)
From page 28...
... 28 d. Right Way: i.
From page 29...
... 29 4. Determine the project objective 5.
From page 30...
... 30 decision making for Practical Design to be successful. The success indicators include: • All proposed projects have a clear objective statement that describes how the project will help the system meet the Final Four.