... 62 This final chapter discusses how the findings and implications of the research can be incorporated into the Decision Guide. Together, the four phases in the Decision Guide comprise the state and metropolitan planning and environmental approval processes as mandated by current federal and state law.
From page 63...
... 63 Source: ICF International and URS Corporation 2014. LRP-4LRP-3LRP-2LRP-1 LRP-11LRP-10 LRP-8 LRP-9LRP-7LRP-6 Approve Transportation Deficiencies Approve Evaluation Criteria, Methods, and Measures Approve Vision and Goals Approve Scope of LRTP Process Approve Conformity Analysis Adopt LRTP by MPO Adopt Preferred Plan Scenario Adopt Finding of Conformity by MPO Approve Plan Scenarios Approve Strategies Approve Financial Assumptions LRP-5 PRO-1 PRO-2 PRO-3 PRO-4 PRO-5 PRO-6 PRO-7 PRO-8 Approve Revenue Sources Approve Methodology for Identifying Project Costs and Criteria for Allocating Revenue Approve Project List Drawn from Adopted Plan Scenario or Solution Set Approve Project Prioritization Reach Consensus on Draft TIP Adopt TIP by MPO Approve TIP by Governor and Incorporate into Draft STIP Reach Consensus on Draft STIP Approve STIP with Respect to Conformity and Fiscal Constraint PRO-9 COR-1 COR-2 COR-3 COR-4 COR-5 COR-6 COR-7 COR-8 Approve Scope of Corridor Planning Process Approve Problem Statements and Opportunities Approve Goals for the Corridor Reach Consensus on Scope of Environmental Review and Analysis Approve Evaluation Criteria, Methods, and Measures Approve Range of Solution Sets Adopt Preferred Solution Set Approve Evaluation Criteria, Methods, and Measures for Prioritization of Projects Adopt Priorities for Implementation COR-9 ENV-1 ENV-2 ENV-3 ENV-4 ENV-5 ENV-6 ENV-10 ENV-11 ENV-12 ENV-13 ENV-14 ENV-15 ENV-7 ENV-8 Reach Consensus on Scope of Environmental Review Approve Notice of Intent Approve Purpose and Need/Reach Consensus on Project Purpose Reach Consensus on Study Area Approve Evaluation Criteria, Methods, and Measures Approve Full Range of Alternatives Approve Preferred Alternative/LEDPA Approve Final Jurisdictional Determination Reach Consensus on Avoidance and Minimization for the LEDPA Approve Final EIS Approve the Record of Decision Render Permit Decision and Approve Avoidance and Minimization Approve Alternatives to Be Carried Forward Approve Draft EIS with Conceptual Mitigation Approve Resource Agency Public Notice ENV-9 DECISION GUIDE LONG-RANGE TRANSPORTATION PLANNING PROGRAMMING ENVIRONMENTAL REVIEW / NEPA MERGED WITH PERMITTING CORRIDOR PLANNING Figure 7.1.
From page 64...
... 64 projects and scenarios and their ability to meet the goals and visions established for the long-range plan. If those goals include generating new revenue sources or gaining access to previously unavailable sources of equity and finance, then toll projects and P3 procurement strategies would score highly in this area and might therefore be more likely to be advanced.
From page 65...
... 65 P3s and Programming The programming phase of the Decision Guide is the process through which the TIP is developed and adopted. TIPs are developed by MPOs for urban areas and by state DOTs for rural areas.
From page 66...
... 66 consideration at this step beyond those P3 considerations that are already designated within the long-range planning and corridor planning processes back to which this step refers. PRO-4 -- Approve Project Prioritization This decision point assesses candidate projects and then prioritizes them based on an assessment of their ability to meet the criteria as established in PRO-2.
From page 67...
... 67 general locations and project concepts that make the project a more attractive candidate for private investors. Although these factors should not be the sole determinants in the process, they should not be ignored, especially if project implementation is projected to require private equity investments.
From page 68...
... 68 independent sets of events. The scope of the environmental review and analysis are necessarily driven by the proposed scope of the activities under consideration.
From page 69...
... 69 federal regulations. Environmental review is generally the last step in the planning process for a transportation improvement, and is followed by final design and construction.
From page 70...
... 70 implicated. For example, the use of toll roads may have operational implications and could change certain environmental impacts.
From page 71...
... 71 • ENV-10 -- Approve Preferred Alternative/Least Environmentally Damaging Practicable Alternative: The preferred alternative is approved with stakeholder input; a consistency check is made with the LRTP and TIP/STIP. • ENV-11 -- Approve Final Jurisdictional Determination: A final determination is made under the Section 404 program.